docs(06): pause work — 06-01 complete, 06-03 pending CI verification
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
+24
-43
@@ -1,48 +1,29 @@
|
||||
{
|
||||
"version": "1.0",
|
||||
"timestamp": "2026-06-24T07:53:36.605Z",
|
||||
"phase": "05",
|
||||
"phase_name": "dashboard-calendar",
|
||||
"phase_dir": ".planning/phases/05-dashboard-calendar",
|
||||
"plan": null,
|
||||
"task": null,
|
||||
"total_tasks": null,
|
||||
"status": "paused",
|
||||
"workflow": "plan-phase",
|
||||
"workflow_step": "revision-verify",
|
||||
"completed_tasks": [
|
||||
{"id": "ui-spec", "name": "UI-SPEC.md created and verified (6/6 dimensions passed)", "status": "done", "commit": "2005448"},
|
||||
{"id": "research", "name": "RESEARCH.md created (react-grid-layout, calendar libs, markdown editor)", "status": "done", "commit": "b5ab2c8"},
|
||||
{"id": "validation", "name": "VALIDATION.md draft created", "status": "done", "commit": null},
|
||||
{"id": "patterns", "name": "PATTERNS.md created (30 files, 24 analogs)", "status": "done", "commit": null},
|
||||
{"id": "initial-plans", "name": "4 initial plans created by planner", "status": "done", "commit": "c8852d2"},
|
||||
{"id": "checker-v1", "name": "Plan checker run — found 2 blockers (05-03 missing requirements field, 05-03 scope too large)", "status": "done"},
|
||||
{"id": "revision", "name": "Planner revision — split 05-03 into 05-03 (backend) + 05-04 (frontend), old 05-04 became 05-05", "status": "done", "commit": null}
|
||||
],
|
||||
"remaining_tasks": [
|
||||
{"id": "checker-v2", "name": "Re-run plan-checker on revised 5 plans", "status": "not_started"},
|
||||
{"id": "req-coverage", "name": "Requirements coverage gate (step 13)", "status": "not_started"},
|
||||
{"id": "decision-coverage", "name": "Decision coverage gate (step 13a)", "status": "not_started"},
|
||||
{"id": "state-update", "name": "Record planning completion in STATE.md (step 13b)", "status": "not_started"},
|
||||
{"id": "roadmap-annotate", "name": "Annotate ROADMAP with wave dependencies (step 13c)", "status": "not_started"},
|
||||
{"id": "commit-plans", "name": "Commit all plan artifacts (step 13d)", "status": "not_started"},
|
||||
{"id": "gap-analysis", "name": "Post-planning gap analysis (step 13e)", "status": "not_started"},
|
||||
{"id": "final-status", "name": "Present final status (step 14)", "status": "not_started"}
|
||||
],
|
||||
"timestamp": "2026-06-25T10:36:54.489Z",
|
||||
"phase": "06",
|
||||
"phase_name": "desktop-client-ci-cd",
|
||||
"phase_dir": ".planning/phases/06-desktop-client-ci-cd",
|
||||
"plan": 3,
|
||||
"task": 4,
|
||||
"total_plans": 3,
|
||||
"completed_plans": ["06-01"],
|
||||
"in_progress_plans": ["06-03"],
|
||||
"remaining_plans": ["06-02"],
|
||||
"status": "in_progress",
|
||||
"stopped_at": "Plan 06-03 Task 4 — CI pipeline verification pending (Run #87)",
|
||||
"resume_command": "/gsd-execute-phase 6",
|
||||
"blockers": [],
|
||||
"human_actions_pending": [],
|
||||
"human_actions_pending": [
|
||||
"Check CI pipeline Run #87 result at https://git.vicolab.de/schalli/tessera-ctl/actions",
|
||||
"If pipeline still fails, check type-check step — prisma generate postinstall was added"
|
||||
],
|
||||
"decisions": [
|
||||
{"decision": "Split 05-03 into backend (05-03) and frontend (05-04) plans", "rationale": "Checker found 5 tasks/20 files in complex calendar domain too large for single plan", "phase": "05"},
|
||||
{"decision": "Visual verification plan renumbered from 05-04 to 05-05", "rationale": "Shifted to accommodate calendar split", "phase": "05"},
|
||||
{"decision": "MVP vertical-slice mode", "rationale": "ROADMAP Mode: mvp for phase 05", "phase": "05"},
|
||||
{"decision": "UI-SPEC: 4 font sizes (12/14/18/28), 2 weights (400/600)", "rationale": "Checker blocked 7 sizes and 3 weights, reduced in revision", "phase": "05"}
|
||||
],
|
||||
"uncommitted_files": [
|
||||
".planning/phases/05-dashboard-calendar/05-04-PLAN.md",
|
||||
".planning/phases/05-dashboard-calendar/05-05-PLAN.md",
|
||||
".planning/phases/05-dashboard-calendar/05-PATTERNS.md",
|
||||
".planning/phases/05-dashboard-calendar/05-VALIDATION.md"
|
||||
],
|
||||
"next_action": "Re-run plan-checker (gsd-plan-checker agent) on all 5 revised plans. If passes, proceed through gates 13→13a→13b→13c→13d→13e→14 to finalize planning.",
|
||||
"context_notes": "Plan-phase workflow paused after revision iteration 1. Planner hit session limit during revision but still wrote the split files to disk. Checker has NOT yet verified the revised plans. The 5 plans cover waves 1-4 with sequential dependencies. All 10 requirement IDs (DASH-01..07, CAL-01..03) should now be covered across the 5 plans."
|
||||
"Gitea user: schalli, repo: schalli/tessera-ctl (private)",
|
||||
"Gitea URL: https://git.vicolab.de",
|
||||
"Git remote uses embedded token credentials in URL",
|
||||
"act_runner already existed as Docker container, reused instead of creating new",
|
||||
"Replaced pnpm/action-setup@v4 with corepack for Gitea Actions compatibility",
|
||||
"Added prisma generate postinstall to apps/api for CI type-check"
|
||||
]
|
||||
}
|
||||
|
||||
Reference in New Issue