docs(06): pause work — 06-01 complete, 06-03 pending CI verification

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
2026-06-25 12:37:49 +02:00
parent faff50b1ee
commit e81dbb0e69
4 changed files with 4524 additions and 47 deletions
+24 -43
View File
@@ -1,48 +1,29 @@
{
"version": "1.0",
"timestamp": "2026-06-24T07:53:36.605Z",
"phase": "05",
"phase_name": "dashboard-calendar",
"phase_dir": ".planning/phases/05-dashboard-calendar",
"plan": null,
"task": null,
"total_tasks": null,
"status": "paused",
"workflow": "plan-phase",
"workflow_step": "revision-verify",
"completed_tasks": [
{"id": "ui-spec", "name": "UI-SPEC.md created and verified (6/6 dimensions passed)", "status": "done", "commit": "2005448"},
{"id": "research", "name": "RESEARCH.md created (react-grid-layout, calendar libs, markdown editor)", "status": "done", "commit": "b5ab2c8"},
{"id": "validation", "name": "VALIDATION.md draft created", "status": "done", "commit": null},
{"id": "patterns", "name": "PATTERNS.md created (30 files, 24 analogs)", "status": "done", "commit": null},
{"id": "initial-plans", "name": "4 initial plans created by planner", "status": "done", "commit": "c8852d2"},
{"id": "checker-v1", "name": "Plan checker run — found 2 blockers (05-03 missing requirements field, 05-03 scope too large)", "status": "done"},
{"id": "revision", "name": "Planner revision — split 05-03 into 05-03 (backend) + 05-04 (frontend), old 05-04 became 05-05", "status": "done", "commit": null}
],
"remaining_tasks": [
{"id": "checker-v2", "name": "Re-run plan-checker on revised 5 plans", "status": "not_started"},
{"id": "req-coverage", "name": "Requirements coverage gate (step 13)", "status": "not_started"},
{"id": "decision-coverage", "name": "Decision coverage gate (step 13a)", "status": "not_started"},
{"id": "state-update", "name": "Record planning completion in STATE.md (step 13b)", "status": "not_started"},
{"id": "roadmap-annotate", "name": "Annotate ROADMAP with wave dependencies (step 13c)", "status": "not_started"},
{"id": "commit-plans", "name": "Commit all plan artifacts (step 13d)", "status": "not_started"},
{"id": "gap-analysis", "name": "Post-planning gap analysis (step 13e)", "status": "not_started"},
{"id": "final-status", "name": "Present final status (step 14)", "status": "not_started"}
],
"timestamp": "2026-06-25T10:36:54.489Z",
"phase": "06",
"phase_name": "desktop-client-ci-cd",
"phase_dir": ".planning/phases/06-desktop-client-ci-cd",
"plan": 3,
"task": 4,
"total_plans": 3,
"completed_plans": ["06-01"],
"in_progress_plans": ["06-03"],
"remaining_plans": ["06-02"],
"status": "in_progress",
"stopped_at": "Plan 06-03 Task 4 — CI pipeline verification pending (Run #87)",
"resume_command": "/gsd-execute-phase 6",
"blockers": [],
"human_actions_pending": [],
"human_actions_pending": [
"Check CI pipeline Run #87 result at https://git.vicolab.de/schalli/tessera-ctl/actions",
"If pipeline still fails, check type-check step — prisma generate postinstall was added"
],
"decisions": [
{"decision": "Split 05-03 into backend (05-03) and frontend (05-04) plans", "rationale": "Checker found 5 tasks/20 files in complex calendar domain too large for single plan", "phase": "05"},
{"decision": "Visual verification plan renumbered from 05-04 to 05-05", "rationale": "Shifted to accommodate calendar split", "phase": "05"},
{"decision": "MVP vertical-slice mode", "rationale": "ROADMAP Mode: mvp for phase 05", "phase": "05"},
{"decision": "UI-SPEC: 4 font sizes (12/14/18/28), 2 weights (400/600)", "rationale": "Checker blocked 7 sizes and 3 weights, reduced in revision", "phase": "05"}
],
"uncommitted_files": [
".planning/phases/05-dashboard-calendar/05-04-PLAN.md",
".planning/phases/05-dashboard-calendar/05-05-PLAN.md",
".planning/phases/05-dashboard-calendar/05-PATTERNS.md",
".planning/phases/05-dashboard-calendar/05-VALIDATION.md"
],
"next_action": "Re-run plan-checker (gsd-plan-checker agent) on all 5 revised plans. If passes, proceed through gates 13→13a→13b→13c→13d→13e→14 to finalize planning.",
"context_notes": "Plan-phase workflow paused after revision iteration 1. Planner hit session limit during revision but still wrote the split files to disk. Checker has NOT yet verified the revised plans. The 5 plans cover waves 1-4 with sequential dependencies. All 10 requirement IDs (DASH-01..07, CAL-01..03) should now be covered across the 5 plans."
"Gitea user: schalli, repo: schalli/tessera-ctl (private)",
"Gitea URL: https://git.vicolab.de",
"Git remote uses embedded token credentials in URL",
"act_runner already existed as Docker container, reused instead of creating new",
"Replaced pnpm/action-setup@v4 with corepack for Gitea Actions compatibility",
"Added prisma generate postinstall to apps/api for CI type-check"
]
}
+4 -4
View File
@@ -3,8 +3,8 @@ gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: executing
stopped_at: Completed 06-03-PLAN.md (Tasks 2-3, Task 4 checkpoint pending)
last_updated: "2026-06-25T09:01:40.210Z"
stopped_at: context exhaustion at 76% (2026-06-25)
last_updated: "2026-06-25T09:55:59.913Z"
last_activity: 2026-06-25 -- Phase 06 execution started
progress:
total_phases: 6
@@ -115,6 +115,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-06-25T09:01:40.203Z
Stopped at: Completed 06-03-PLAN.md (Tasks 2-3, Task 4 checkpoint pending)
Last session: 2026-06-25T09:55:59.905Z
Stopped at: context exhaustion at 76% (2026-06-25)
Resume file: None
@@ -0,0 +1,49 @@
# Continue Here — Phase 06: Desktop Client & CI/CD
**Paused:** 2026-06-25T10:36Z
**Resume:** `/gsd-execute-phase 6`
## Current State
### Plan 06-01: Tauri Desktop Wrapper ✅ COMPLETE
- Toolchain installed (rustc 1.96.0, WebKitGTK 2.52.3)
- apps/desktop scaffolded as @tessera/desktop, cargo check passes
- First-run setup.html with server URL persistence
- Commits: 48e3a69, d944aaa, f41e673
### Plan 06-03: Gitea CI/CD ⏳ IN PROGRESS (Task 4/4)
- Gitea user `schalli` created, repo `schalli/tessera-ctl` (private)
- Remote: `origin` → `https://git.vicolab.de/schalli/tessera-ctl.git` (token in URL)
- act_runner: existing Docker container reused (gitea-docker-runner-1, v0.6.1)
- docker-compose.ci.yml + docs/ci-cd-setup.md created (c0e3293)
- .gitea/workflows/ci.yml created (756925b)
- **CI fixes pushed:** corepack statt pnpm/action-setup (e5d45e1), prisma generate postinstall (faff50b)
- **Pending:** Run #87 Ergebnis pruefen — type-check sollte jetzt passen
### Plan 06-02: Native Desktop Features ❌ NOT STARTED (Wave 2)
- Depends on 06-01 (complete)
- Tray, close-to-tray, window-state, autostart, notifications, version check, icons, bundles
## Human Actions Before Resume
1. Check Pipeline Run #87: https://git.vicolab.de/schalli/tessera-ctl/actions
2. If still failing, paste the error — likely needs another CI fix
## Key Infrastructure
- **Gitea:** https://git.vicolab.de — User: schalli, Token in git remote URL
- **Runner Token:** SK5NCGjVMTxg6NYleLeOlc3qAuLrDxbvlENGIixJ
- **MCP Token:** cdfaa3668ec21439bc6acd2243abd6df701177e8 (updated in .claude.json, needs restart to take effect)
## Uncommitted Files
- .planning/STATE.md (modified)
- apps/desktop/src-tauri/Cargo.lock (untracked, should be committed)
- apps/desktop/src-tauri/gen/ (untracked, Tauri generated)
## Critical Anti-Patterns
| Anti-Pattern | Severity | Detail |
|-------------|----------|--------|
| pnpm/action-setup incompatible with Gitea Actions | advisory | Use corepack instead — already fixed |
| Prisma types missing in CI | advisory | postinstall added — verify Run #87 |
+4447