schalli
105683b94b
docs(17): create phase plan
2026-08-12 08:26:00 +02:00
schalli
149b5aa810
docs(15): write the missing 15-04 summary, closing Phase 15
...
Tessera CI/CD / Lint & Type Check (push) Successful in 47s
Tessera CI/CD / Tests (push) Successful in 49s
Tessera CI/CD / Build & Publish Images (push) Successful in 7s
The AD group membership sync shipped on 2026-08-04 as 614de28; only its
summary was never written, which left Phase 15 sitting at 7/8 as if work were
outstanding. Nothing was.
Each promise the plan made is checked against today's source rather than
against the commit message: bound-only selection, no second sync job, deletion
restricted to source LDAP, manual memberships preserved, memberOf reverse query
instead of attribute reads, RFC-4515 escaping of the group DN, no nested-group
resolution, order independence, per-group error isolation. The 2026-08-11 sync
run on alpha additionally exercised this path against a real directory.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com >
2026-08-11 14:04:53 +02:00
schalli
208e449bc9
docs(16): UAT test 7 passed after the full sync run
...
Tessera CI/CD / Lint & Type Check (push) Successful in 46s
Tessera CI/CD / Tests (push) Successful in 50s
Tessera CI/CD / Build & Publish Images (push) Successful in 7s
The user released the full run once it was clear nothing there is productive
yet. All three report lines appeared (401 created / 9 memberships added / 0
groups adopted, renamed or deleted), and the amber default-marker line stayed
absent as it should when nothing was deleted.
The run doubles as the end-to-end proof for the 260811-f9i fix: the imported
group survived the sweep with its memberships filled, where the old filter
would have deleted it in exactly this run.
Roadmap marks Phase 16 complete; Phase 15 keeps its 7/8 with the reason named.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com >
2026-08-11 13:37:47 +02:00
schalli
7464d32625
docs(16-05): complete Sync-Bericht-und-Freigabe-Matrix plan (Phase 16 done, PERM-02)
2026-08-06 16:41:29 +02:00
schalli
184a3a1174
docs(16-04): complete Gruppen-Dialog-Umbau plan
2026-08-06 16:33:59 +02:00
schalli
5a687a9d01
docs(16-03): complete Gruppen-Rekonziliation plan
2026-08-06 16:24:25 +02:00
schalli
da0361df5f
docs(16-02): complete backend name-lock/internalName/default-handoff plan
2026-08-06 16:03:54 +02:00
schalli
1b19876c32
docs(16-01): complete AD group import tracer plan
2026-08-06 15:49:26 +02:00
schalli
c4a25511f3
docs(16): create phase plan
2026-08-06 14:42:44 +02:00
schalli
3dfa671ec9
docs(16): create phase plan — 5 plans, 4 waves, tracer-first
2026-08-06 14:38:45 +02:00
schalli
5c7d4ad128
docs(16): reassign PERM-02 to phase 16 with import semantics
2026-08-06 14:10:53 +02:00
schalli
be1183a61c
docs(roadmap): add Phase 16 AD group synchronisation
2026-08-05 08:54:55 +02:00
schalli
d15475d6d7
docs(15-08): complete Serverseitige Modulsperre und Marketplace-Sperr-Badge plan
2026-08-04 19:53:13 +02:00
schalli
c6086ba750
docs(15-07): complete Freigabe-Matrix, Aktivierungsdialog und Benutzer-Detail-Grants plan
2026-08-04 19:28:18 +02:00
schalli
a3e8d0a158
docs(15-06): complete Gruppenverwaltung im Admin-UI plan
2026-08-04 19:06:54 +02:00
schalli
09abb2b323
docs(15-03): complete modul-freigaben-schreibseite plan
2026-08-04 18:43:45 +02:00
schalli
2a79d4ca1f
docs(15-05): complete dashboard-widget-modulfilterung plan
2026-08-04 15:39:48 +02:00
schalli
c4d7b7ded6
docs(15-02): complete Gruppenverwaltung & Standardgruppen-Mitgliedschaft plan
2026-08-04 15:27:48 +02:00
schalli
79c83eae5f
docs(15-01): complete Group/ModuleGrant foundation plan
2026-08-04 15:14:21 +02:00
schalli
ac65149964
docs(15): create phase plan
2026-08-04 14:44:05 +02:00
schalli
8a4bb32847
docs(15): create phase plan — 8 plans, 4 waves, PERM-01..07
Tessera CI/CD / Lint & Type Check (push) Successful in 47s
Tessera CI/CD / Tests (push) Successful in 46s
Tessera CI/CD / Build & Publish Images (push) Successful in 6s
2026-08-04 14:39:46 +02:00
schalli
d4ae20b300
docs(15): add PERM-01..07 requirements and widget success criterion
2026-08-04 11:59:50 +02:00
schalli
7e1b4a2964
docs(roadmap): add Phase 15 module permissions (groups & user grants)
...
Two-level module access: tenant activation stays a prerequisite, plus new
per-group and per-user grants. Records the four design decisions taken with
the user: Tessera-owned groups with optional AD binding, closed-by-default
access, ADMIN/SUPER_ADMIN bypass within their tenant, and access on/off only
(no permission levels inside modules). Starts milestone v1.2.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com >
2026-08-04 08:42:56 +02:00
schalli
eff5d26413
docs(14-05): complete i18n rollout for tender-radar plan
Tessera CI/CD / Lint & Type Check (push) Successful in 47s
Tessera CI/CD / Tests (push) Successful in 55s
Tessera CI/CD / Build & Publish Images (push) Successful in 1m51s
2026-07-23 14:23:23 +02:00
schalli
a4889f8399
docs(14-04): complete denylist transparency plan
2026-07-23 14:01:12 +02:00
schalli
6e3789a0b0
docs(14-02): complete RSS ingestion slice plan
Tessera CI/CD / Lint & Type Check (push) Successful in 47s
Tessera CI/CD / Tests (push) Successful in 49s
Tessera CI/CD / Build & Publish Images (push) Successful in 2m15s
2026-07-23 13:33:01 +02:00
schalli
a47c0c57ee
docs(14-01): complete inbox-module extraction plan
2026-07-23 13:11:21 +02:00
schalli
cf105f0884
docs(14): create phase plan (5 plans, 4 waves)
2026-07-23 12:14:26 +02:00
schalli
7602795622
docs(13-05): complete cosinex/DTVP adapter plan
2026-07-23 09:51:43 +02:00
schalli
775ed153b7
docs(13-04): complete NetServer adapter plan
Tessera CI/CD / Lint & Type Check (push) Successful in 48s
Tessera CI/CD / Tests (push) Successful in 45s
Tessera CI/CD / Build & Publish Images (push) Successful in 3m43s
2026-07-23 09:16:04 +02:00
schalli
2c28605397
docs(13-06): complete multi-source read surface plan
2026-07-23 08:57:25 +02:00
schalli
1c523c039c
docs(13-03): complete dedup-resolver-fan-out-wiring plan
2026-07-23 08:53:33 +02:00
schalli
83d8eff40d
docs(13-02): complete source-registry-denylist plan
2026-07-23 08:44:53 +02:00
schalli
a547a1d31d
docs(13-01): complete fingerprint + TenderSource datenkern plan
2026-07-23 08:40:47 +02:00
schalli
74c00166e2
docs(13): create phase plan — scraping adapters + cross-source dedup
...
6 plans (INGEST-02/03/07, SCHEMA-03) + Nyquist validation.
Core (registry, fingerprint, dedup, TenderSource, backfill) lands
first and is green independent of live scraping (D-01).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-07-23 08:24:16 +02:00
schalli
314e83f5c1
docs(12-04): complete digest-interval + Sofort-Alert UI plan
2026-07-22 09:32:45 +02:00
schalli
1a0cd375c2
docs(12-03): complete instant-alert dispatch plan
2026-07-22 09:23:21 +02:00
schalli
f509bf4948
docs(12-02): complete digest-mail plan
2026-07-22 09:16:22 +02:00
schalli
4823c245ee
docs(12-01): complete schema + delta-only matching plan
2026-07-22 09:07:06 +02:00
schalli
09993b001c
docs(12): create phase plan (4 vertical slices, waves 1-3)
2026-07-22 08:52:05 +02:00
schalli
f7a2bfd3d8
docs(11-06): complete Persönliche Suchprofile plan
2026-07-21 16:53:08 +02:00
schalli
421fe00ed9
docs(11-05): complete Persönliche Triage plan
2026-07-21 16:40:22 +02:00
schalli
4c22d7731a
docs(11-04): complete Detailansicht plan
2026-07-21 16:23:38 +02:00
schalli
acd7e55094
docs(11-03): complete CPV-Divisions-Katalog + Wert-Filter-UI plan
2026-07-21 16:16:59 +02:00
schalli
a4c02116c1
docs(11-02): complete region/plz/bundesland filter plan
2026-07-21 16:05:25 +02:00
schalli
3e064e0124
docs(11-01): complete query-engine + results-ui + coverage-banner plan
2026-07-21 15:57:25 +02:00
schalli
4036991acd
docs(11): create phase plan — 6 vertical-slice plans (filter engine, results UI, saved searches)
...
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-07-21 15:17:48 +02:00
schalli
4f3c6cf5e9
docs(10-06): complete tender-radar admin settings UI plan
2026-07-21 11:27:31 +02:00
schalli
6d6302294e
docs(10-05): complete tenders controller plan
2026-07-21 11:21:52 +02:00
schalli
9227cc9e78
docs(10-04): complete ingestion orchestration & multi-tenant-safe scheduler plan
2026-07-21 11:13:39 +02:00