Commit Graph

14 Commits

Author SHA1 Message Date
schalli f925fd3654 docs(05): complete phase plan (5 plans, 5 waves, 10/10 coverage) 2026-06-24 10:13:22 +02:00
schalli 6e99ccc2a1 fix(05): clean must_haves, trailing XML, update ROADMAP to 5 plans
- Remove frontend artifacts from 05-03 must_haves (belong to 05-04)
- Remove trailing XML generation artifacts from 05-04 and 05-05
- Update ROADMAP Phase 5: 5 plans across 4 waves

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-24 10:07:35 +02:00
schalli c8852d2014 docs(05): create dashboard & calendar phase plan
4 plans across 4 waves covering DASH-01..07 + CAL-01..03.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 14:42:11 +02:00
schalli 0470d500b2 docs(04): create phase plan — marketplace & portal navigation (4 plans, 3 waves)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-22 14:17:02 +02:00
schalli 2832d06ad7 docs(phase-03): update tracking after wave 2
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-19 13:41:54 +02:00
schalli 4867c30bcd docs(phase-03): update tracking after wave 1
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-19 12:40:02 +02:00
schalli 89f559ce62 docs(03): create phase plan for Module System & Domaincheck
4 plans across 3 waves: SDK + registry (W1), Domaincheck module +
lazy loading (W2), visual verification (W3). Covers MOD-01..04,
DCHK-01..03.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-19 12:13:20 +02:00
schalli eaaa9adfa5 docs(02-02): complete frontend auth and user/tenant CRUD plan 2026-06-18 13:42:00 +02:00
schalli e8e89686f5 docs(02): create phase 2 authentication & multi-tenancy plans
5 plans across 4 waves covering all 9 requirements (AUTH-01..06, TNNT-01..03)
and 18 locked decisions (D-01..D-18):
- Plan 01 (W1): Backend auth foundation with Prisma schema, RLS, JWT, admin seed
- Plan 02 (W2): Frontend auth flow, login page, user/tenant CRUD admin pages
- Plan 03 (W2): SUS package verification, password reset, force-change interceptor
- Plan 04 (W3): LDAP sync service, per-tenant config, field mapping, admin UI
- Plan 05 (W4): Visual verification of complete auth and multi-tenancy system

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-18 13:10:13 +02:00
schalli 224fd59196 docs(01-02): complete Portal Shell plan with SUMMARY, state updates
- SUMMARY.md documenting design tokens, i18n, layout components
- STATE.md advanced to plan 2/3, decisions recorded
- ROADMAP.md updated to 2/3 plans complete
- REQUIREMENTS.md: PRTAL-01, PRTAL-04, UI-01, UI-02, UI-03 marked complete
2026-06-18 10:31:16 +02:00
schalli 0517e2b2b9 docs(01-01): complete walking skeleton plan
- Created 01-01-SUMMARY.md with execution results
- Updated STATE.md with plan completion and metrics
- Updated ROADMAP.md marking plan 01-01 complete
- Updated REQUIREMENTS.md marking INFRA-01, INFRA-02, INFRA-03 complete
2026-06-18 10:20:25 +02:00
schalli 382d2597c7 docs(01): create phase plan 2026-06-18 09:40:09 +02:00
schalli fc5a6f3832 docs(01): create phase 1 plans -- walking skeleton + portal shell
Three plans for Foundation & Portal Shell phase:
- 01-01: Monorepo scaffold, Docker Compose with 3-network segmentation, NestJS API, Next.js app, PostgreSQL
- 01-02: Design tokens (yellow #ffed00 primary), i18n (DE/EN), theme switching, responsive portal layout
- 01-03: Visual verification checkpoint for human approval

Includes SKELETON.md documenting architectural decisions for subsequent phases.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-18 09:37:08 +02:00
schalli 4a71f1f774 docs: create roadmap (6 phases) 2026-06-18 08:45:41 +02:00