No phase work in flight: Phase 15 (8/8) and Phase 16 (5/5) are both closed and
the roadmap reflects it. The handoff therefore sits at project level rather
than in a phase directory.
Records four anti-patterns discovered through actual failure this session, two
of them marked blocking: the tautological test that let the objectGUID defect
through review, and the fact that /opt/tessera is not a checkout, so compose
changes in this repository never reach the test server.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Record the per-user exclude/denylist filter (9d1323f) and its live
verification as complete, close out the two other carried-over items
(full-sync verify, quick-tasks bookkeeping), and backfill the STATE.md
Quick Tasks table with the direct-fix commits that never got /gsd-quick
entries.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>