phase 05-dashboard-calendar null null planning_revision 2026-06-24T07:53:36.605Z

<current_state> Phase 05 plan-phase workflow, mid-revision loop (iteration 1/3).

Planner created initial 4 plans → checker found 2 blockers → planner revised (split 05-03) → produced 5 plans on disk. Checker has NOT yet verified revised plans.

5 plans on disk:

  • 05-01-PLAN.md — Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell (Wave 1) [DASH-01/02/03/07]
  • 05-02-PLAN.md — Search + Notes widgets, widget settings panel, SearchProvider backend (Wave 2) [DASH-04/06]
  • 05-03-PLAN.md — Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (Wave 3) [CAL-01/02/03, DASH-05]
  • 05-04-PLAN.md — Calendar frontend: event aggregation, calendar widget, settings UI (Wave 3, depends on 05-03) [CAL-01/02/03, DASH-05]
  • 05-05-PLAN.md — Visual verification checkpoint (Wave 4) [all 10 reqs] </current_state>

<completed_work>

Session Work (2026-06-23):

  • UI-SPEC.md: Created and verified (6/6 dimensions passed, 1 revision for typography)
  • RESEARCH.md: Created (react-grid-layout v2, tsdav/node-ical/ews for calendar, @uiw/react-md-editor for notes, AES-256-GCM for credential encryption)
  • VALIDATION.md: Draft created
  • PATTERNS.md: Created (30 files classified, 24 analogs found)
  • Initial 4 plans: Created by gsd-planner (opus)
  • Plan checker v1: Found 2 blockers (05-03 missing requirements frontmatter, 05-03 scope 5 tasks/20 files too large)
  • Planner revision: Split 05-03 into backend (05-03) + frontend (05-04), renamed old 05-04 verification to 05-05 </completed_work>

<remaining_work>

Plan-phase workflow steps remaining:

  1. Re-run gsd-plan-checker on all 5 revised plans (step 10)
  2. Handle checker return (step 11)
  3. If passes → requirements coverage gate (step 13)
  4. Decision coverage gate (step 13a)
  5. Record planning in STATE.md (step 13b)
  6. Annotate ROADMAP wave dependencies (step 13c)
  7. Commit all plans (step 13d)
  8. Post-planning gap analysis (step 13e)
  9. Present final status and next steps (step 14) </remaining_work>

<decisions_made>

  • Split 05-03 into backend/frontend plans — checker found 5 tasks/20 files in complex calendar domain exceeded scope sanity
  • MVP vertical-slice mode — per ROADMAP Mode: mvp
  • UI-SPEC: 4 font sizes (12/14/18/28px), 2 weights (400/600) — reduced from 7 sizes/3 weights after checker blocked
  • Schema push: [BLOCKING] Prisma db push task injected in each schema-modifying plan
  • Security: ASVS L1 threat models required in each plan </decisions_made>
None — revision produced files, just needs verification pass.

Required Reading (in order)

  1. .planning/phases/05-dashboard-calendar/05-CONTEXT.md — 22 locked decisions (D-01..D-22)
  2. .planning/phases/05-dashboard-calendar/05-RESEARCH.md — Tech stack decisions, library choices
  3. .planning/phases/05-dashboard-calendar/05-UI-SPEC.md — Visual/interaction contracts
  4. .planning/phases/05-dashboard-calendar/05-*-PLAN.md — All 5 plan files
  5. $HOME/.claude/gsd-core/workflows/plan-phase.md — Workflow definition (steps 10-14 remain)

Infrastructure State

  • No servers running
  • No background processes
  • Docker stack not started for this phase yet
Plan-phase orchestrator role. Was executing the plan-phase workflow from gsd-core/workflows/plan-phase.md. Revision iteration 1 of max 3. prev_issue_count=2 (blockers). stall_reentry_count=0. The planner agent hit its session token limit during revision but still wrote the split files to disk successfully. Uncommitted files: 05-04-PLAN.md (modified), 05-05-PLAN.md (new), 05-PATTERNS.md (new), 05-VALIDATION.md (new).

<next_action> Start with: Spawn gsd-plan-checker agent on all 5 plans (.planning/phases/05-dashboard-calendar/05-0[1-5]-PLAN.md). If verification passes, proceed through steps 13→14 to finalize planning. If issues found, iterate (revision count 2/3). Alternatively: run /gsd-plan-phase 05 which will detect existing plans and offer to continue. </next_action>