e60d34dc28
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
4.1 KiB
4.1 KiB
context, phase, task, total_tasks, status, last_updated
| context | phase | task | total_tasks | status | last_updated |
|---|---|---|---|---|---|
| phase | 05-dashboard-calendar | null | null | planning_revision | 2026-06-24T07:53:36.605Z |
<current_state> Phase 05 plan-phase workflow, mid-revision loop (iteration 1/3).
Planner created initial 4 plans → checker found 2 blockers → planner revised (split 05-03) → produced 5 plans on disk. Checker has NOT yet verified revised plans.
5 plans on disk:
- 05-01-PLAN.md — Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell (Wave 1) [DASH-01/02/03/07]
- 05-02-PLAN.md — Search + Notes widgets, widget settings panel, SearchProvider backend (Wave 2) [DASH-04/06]
- 05-03-PLAN.md — Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (Wave 3) [CAL-01/02/03, DASH-05]
- 05-04-PLAN.md — Calendar frontend: event aggregation, calendar widget, settings UI (Wave 3, depends on 05-03) [CAL-01/02/03, DASH-05]
- 05-05-PLAN.md — Visual verification checkpoint (Wave 4) [all 10 reqs] </current_state>
<completed_work>
Session Work (2026-06-23):
- UI-SPEC.md: Created and verified (6/6 dimensions passed, 1 revision for typography)
- RESEARCH.md: Created (react-grid-layout v2, tsdav/node-ical/ews for calendar, @uiw/react-md-editor for notes, AES-256-GCM for credential encryption)
- VALIDATION.md: Draft created
- PATTERNS.md: Created (30 files classified, 24 analogs found)
- Initial 4 plans: Created by gsd-planner (opus)
- Plan checker v1: Found 2 blockers (05-03 missing requirements frontmatter, 05-03 scope 5 tasks/20 files too large)
- Planner revision: Split 05-03 into backend (05-03) + frontend (05-04), renamed old 05-04 verification to 05-05 </completed_work>
<remaining_work>
Plan-phase workflow steps remaining:
- Re-run gsd-plan-checker on all 5 revised plans (step 10)
- Handle checker return (step 11)
- If passes → requirements coverage gate (step 13)
- Decision coverage gate (step 13a)
- Record planning in STATE.md (step 13b)
- Annotate ROADMAP wave dependencies (step 13c)
- Commit all plans (step 13d)
- Post-planning gap analysis (step 13e)
- Present final status and next steps (step 14) </remaining_work>
<decisions_made>
- Split 05-03 into backend/frontend plans — checker found 5 tasks/20 files in complex calendar domain exceeded scope sanity
- MVP vertical-slice mode — per ROADMAP Mode: mvp
- UI-SPEC: 4 font sizes (12/14/18/28px), 2 weights (400/600) — reduced from 7 sizes/3 weights after checker blocked
- Schema push: [BLOCKING] Prisma db push task injected in each schema-modifying plan
- Security: ASVS L1 threat models required in each plan </decisions_made>
Required Reading (in order)
.planning/phases/05-dashboard-calendar/05-CONTEXT.md— 22 locked decisions (D-01..D-22).planning/phases/05-dashboard-calendar/05-RESEARCH.md— Tech stack decisions, library choices.planning/phases/05-dashboard-calendar/05-UI-SPEC.md— Visual/interaction contracts.planning/phases/05-dashboard-calendar/05-*-PLAN.md— All 5 plan files$HOME/.claude/gsd-core/workflows/plan-phase.md— Workflow definition (steps 10-14 remain)
Infrastructure State
- No servers running
- No background processes
- Docker stack not started for this phase yet
<next_action>
Start with: Spawn gsd-plan-checker agent on all 5 plans (.planning/phases/05-dashboard-calendar/05-0[1-5]-PLAN.md). If verification passes, proceed through steps 13→14 to finalize planning. If issues found, iterate (revision count 2/3).
Alternatively: run /gsd-plan-phase 05 which will detect existing plans and offer to continue.
</next_action>