Files
tessera-ctl/.planning/phases/04-marketplace-portal-navigation/04-04-SUMMARY.md
T
schalli 7c35c17a07 docs(04-04): complete Phase 04 verification, close phase
Human verified marketplace features on localhost. 26 tests green.
Reverse proxy API URL config deferred. Phase 04 done, ready for Phase 05.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 12:26:33 +02:00

1.5 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established requirements-completed duration completed
04-marketplace-portal-navigation 04 verification
manual-testing
e2e
phase provides
04-marketplace-portal-navigation/01-03 All marketplace and sidebar features
Human-verified Phase 04 feature set
added patterns
created modified
Reverse proxy API URL config deferred — localhost works, external access needs NEXT_PUBLIC_API_URL fix
MRKT-01
MRKT-02
MRKT-03
MRKT-04
PRTAL-02
PRTAL-03
PRTAL-05
5min 2026-06-23

Plan 04-04: Human Verification Summary

Marketplace, activation flows, sidebar navigation, and search all verified working on localhost

Performance

  • Duration: ~5 min
  • Tasks: 2
  • Files modified: 0

Accomplishments

  • 26/26 unit tests green, type-check clean
  • Docker stack rebuilt with latest code
  • User confirmed marketplace page loads and features work on localhost
  • Known issue: NEXT_PUBLIC_API_URL hardcoded to localhost:3001 — external access via reverse proxy needs config update (deferred)

Deviations from Plan

  • Full 12-step checklist abbreviated — user confirmed overall functionality on localhost
  • Reverse proxy URL issue noted but deferred (not a Phase 04 code issue)

Next Phase Readiness

  • Phase 04 complete, ready for Phase 05

Phase: 04-marketplace-portal-navigation Completed: 2026-06-23