96432a6a7b
No phase work in flight: Phase 15 (8/8) and Phase 16 (5/5) are both closed and the roadmap reflects it. The handoff therefore sits at project level rather than in a phase directory. Records four anti-patterns discovered through actual failure this session, two of them marked blocking: the tautological test that let the objectGUID defect through review, and the fact that /opt/tessera is not a checkout, so compose changes in this repository never reach the test server. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>