7c35c17a07
Human verified marketplace features on localhost. 26 tests green. Reverse proxy API URL config deferred. Phase 04 done, ready for Phase 05. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
1.5 KiB
1.5 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 04-marketplace-portal-navigation | 04 | verification |
|
|
|
|
|
|
|
5min | 2026-06-23 |
Plan 04-04: Human Verification Summary
Marketplace, activation flows, sidebar navigation, and search all verified working on localhost
Performance
- Duration: ~5 min
- Tasks: 2
- Files modified: 0
Accomplishments
- 26/26 unit tests green, type-check clean
- Docker stack rebuilt with latest code
- User confirmed marketplace page loads and features work on localhost
- Known issue: NEXT_PUBLIC_API_URL hardcoded to localhost:3001 — external access via reverse proxy needs config update (deferred)
Deviations from Plan
- Full 12-step checklist abbreviated — user confirmed overall functionality on localhost
- Reverse proxy URL issue noted but deferred (not a Phase 04 code issue)
Next Phase Readiness
- Phase 04 complete, ready for Phase 05
Phase: 04-marketplace-portal-navigation Completed: 2026-06-23