7.6 KiB
gsd_state_version, milestone, milestone_name, current_phase, current_phase_name, status, stopped_at, last_updated, last_activity, last_activity_desc, progress
| gsd_state_version | milestone | milestone_name | current_phase | current_phase_name | status | stopped_at | last_updated | last_activity | last_activity_desc | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | 08 | dashboard-widgets-vollimplementierung | executing | Phase 8 context gathered | 2026-07-01T07:46:32.037Z | 2026-07-01 | Phase 08 execution resumed (wave continue) |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-06-18)
Core value: Eine zentrale Plattform, in der beliebige Workflow-Tools als Module lizenziert, aktiviert und genutzt werden koennen -- ohne zwischen verschiedenen Anwendungen wechseln zu muessen. Current focus: Phase 08 — dashboard-widgets-vollimplementierung
Current Position
Phase: 08 (dashboard-widgets-vollimplementierung) — EXECUTING Plan: 1 of 4 Status: Executing Phase 08 Last activity: 2026-07-01 — Phase 08 execution resumed (wave continue)
Progress: [█████████░] 93%
Performance Metrics
Velocity:
- Total plans completed: 2
- Average duration: 12 min
- Total execution time: 0.38 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-foundation-portal-shell | 2/3 | 23 min | 12 min |
Recent Trend:
- Last 5 plans: 01-01 (16 min), 01-02 (7 min)
- Trend: improving
Updated after each plan completion | Phase 02-authentication-multi-tenancy P02 | 8min | 3 tasks | 26 files | | Phase 02-authentication-multi-tenancy P03 | 5min | 2 tasks | 20 files | | Phase 05-dashboard-calendar P01 | 14min | 4 tasks | 28 files | | Phase 05-dashboard-calendar P02 | 4min | 4 tasks | 16 files | | Phase 05-dashboard-calendar P03 | 11min | 4 tasks | 14 files | | Phase 05-dashboard-calendar PP04 | 5min | 2 tasks | 11 files | | Phase 06-desktop-client-ci-cd P01 | 5min | 2 tasks | 13 files | | Phase 06 P03 | 3min | 3 tasks | 3 files | | Phase 07-dkv-fleet-module P03 | 5min | 4 tasks | 8 files | | Phase 07-dkv-fleet-module P04 | 7min | 3 tasks | 8 files | | Phase 07-dkv-fleet-module P05 | 8min | 3 tasks | 11 files | | Phase 07-dkv-fleet-module P06 | 5min | 2 tasks | 7 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Roadmap]: 6 phases derived from 44 v1 requirements, standard granularity
- [Roadmap]: Research recommends NestJS + Next.js + PostgreSQL RLS + Keycloak + Tauri stack
- [01-01]: Used Traefik v2.11 instead of v3.4 due to Docker API version incompatibility on host
- [01-01]: Traefik placed on frontend-net + backend-net for routing to both web and api services
- [01-01]: API Dockerfile copies full monorepo node_modules structure for pnpm workspace compatibility
- [01-02]: OKLCH color space for all design tokens (Tailwind v4 native, perceptually uniform)
- [01-02]: Dark mode uses oklch(0.17 0.01 260) dark gray-blue for comfortable contrast with yellow primary
- [01-02]: Cookie-based locale (NEXT_LOCALE) instead of URL routing for portal app
- [01-02]: CSS custom property --current-sidebar-width for responsive main content margin
- [Phase ?]: Route groups (auth)/(portal) for layout separation: auth pages standalone, portal pages wrapped in AppShell
- [Phase ?]: Controller-level tenant isolation for ADMIN role as defense-in-depth alongside RLS
- [Phase ?]: Remember-me controls cookie maxAge (30d session vs browser-session) not separate token type
- [Phase ?]: react-grid-layout v2 uses dragConfig/resizeConfig instead of isDraggable/isResizable
- [05-02]: SearchProvider defaults as constants merged with user DB rows (no seed migration)
- [05-02]: useRef with explicit undefined initial value for React 19 strict TypeScript
- [05-03]: DAVClient class constructor instead of createDAVClient factory (tsdav v2 type compatibility)
- [05-03]: Dynamic imports for ews-javascript-api and @microsoft/microsoft-graph-client (lazy-load)
- [05-03]: In-memory Map cache with 5-min TTL for calendar events (Redis not needed at current scale)
- [05-03]: ews-javascript-api imported as any (no TypeScript definitions available)
- [Phase ?]: Optimistic UI for calendar visibility toggle — reverts on API error
- [Phase ?]: Auto-run testSource after adding new calendar source for immediate feedback
- [Phase ?]: URL constructor for client-side https-only validation (T-05-14)
- [Phase ?]: StoreExt trait import required for app.store() in Tauri 2.x
- [Phase ?]: frontendDist=../src local page, navigate() for runtime URL override
- [Phase ?]: CSP connect-src wildcard for configurable server URL (D-02)
- [Phase ?]: Plain docker compose build statt build-push-action (Gitea JWT Pitfall 4)
- [Phase ?]: Ephemeral runner mode (GITEA_RUNNER_EPHEMERAL=1) fuer Credential-Revokation pro Job
- [Phase ?]: Separate docker-compose.ci.yml fuer opt-in CI-Infrastruktur
- [07-01]: DKV PDF uses two extraction formats: single-tx (tab-separated) vs multi-tx (columnar) — both handled in DkvParserService
- [07-01]: Research Pattern 4 regex replaced with empirical dual-format tab/columnar parser after testing against real invoice.pdf
- [07-01]: CalendarCryptoService exported from CalendarModule for DKV credential encryption reuse
- [07-02]: Max attachment size 25MB enforced in both ImapProvider and ExchangeInboxProvider before buffering (T-07-05)
- [07-02]: ExchangeInboxProvider uses WellKnownFolderName.Inbox + FindItems (not FindAppointments — email vs calendar EWS API)
- [07-02]: export type {} required for type-only re-exports under isolatedModules TypeScript setting
- [07-03]: SettingsService.getStartupSmtpConfig uses findFirst (tenant-agnostic) for MailModule startup transport
- [07-03]: MailModule forRootAsync factory priority: DB SmtpConfig → MAIL_* env → TESSERA_SMTP_* env → localhost:1025 fallback
- [07-03]: DkvMailService injects SettingsService (not PrismaService directly) to reuse decryption logic
- [07-03]: user-files/ path resolved via path.resolve(__dirname, 4 levels up) from apps/api/dist/dkv/ to monorepo root
- [07-03]: Export prune sorted by mtime ascending (oldest first), delete all beyond last 10
- [07-04]: DkvScheduler v1 uses findFirst() — single-tenant; multi-tenant scheduling deferred
- [07-04]: Circular dep DkvService<->DkvScheduler avoided via controller coordination after PUT config
- [07-04]: CronJob resolved via require() workaround (pnpm strict isolation: transitive dep)
- [07-04]: rechnungsnummer from email subject regex /d{2}-d{9}-d{3}/; fallback=email-{uid}
- [07-05]: refreshKey lift: parent increments on checkNow success; InvoiceHistoryTable reruns useEffect
- [07-05]: onItemsLoaded callback: InvoiceHistoryTable notifies parent; parent passes items to ExportFileList (avoids second fetch)
- [07-05]: Password blank on load: configToForm() always sets password=''; hasPassword boolean drives UX hint only
- [07-05]: CsvImportButton replace: two-step inline confirm (not full modal); accept=".csv" client-side guard
Pending Todos
None yet.
Blockers/Concerns
None yet.
Quick Tasks Completed
| # | Description | Date | Commit | Directory |
|---|---|---|---|---|
| 260630-gbh | User Settings: Passwort ändern (nur non-LDAP) + Profilbild setzen | 2026-06-30 | merge | 260630-gbh-user-settings-passwort-ndern-nur-non-lda |
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-07-01T06:33:00.382Z Stopped at: Phase 8 context gathered Resume file: .planning/phases/08-dashboard-widgets-vollimplementierung/08-CONTEXT.md