e60d34dc28
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
78 lines
2.4 KiB
Markdown
78 lines
2.4 KiB
Markdown
---
|
|
phase: 05
|
|
slug: dashboard-calendar
|
|
status: draft
|
|
nyquist_compliant: false
|
|
wave_0_complete: false
|
|
created: 2026-06-23
|
|
---
|
|
|
|
# Phase 05 — Validation Strategy
|
|
|
|
> Per-phase validation contract for feedback sampling during execution.
|
|
|
|
---
|
|
|
|
## Test Infrastructure
|
|
|
|
| Property | Value |
|
|
|----------|-------|
|
|
| **Framework** | vitest |
|
|
| **Config file** | apps/web/vitest.config.ts |
|
|
| **Quick run command** | `pnpm --filter web test --run` |
|
|
| **Full suite command** | `pnpm --filter web test --run && pnpm --filter api test --run` |
|
|
| **Estimated runtime** | ~30 seconds |
|
|
|
|
---
|
|
|
|
## Sampling Rate
|
|
|
|
- **After every task commit:** Run `pnpm --filter web test --run`
|
|
- **After every plan wave:** Run `pnpm --filter web test --run && pnpm --filter api test --run`
|
|
- **Before `/gsd-verify-work`:** Full suite must be green
|
|
- **Max feedback latency:** 30 seconds
|
|
|
|
---
|
|
|
|
## Per-Task Verification Map
|
|
|
|
| Task ID | Plan | Wave | Requirement | Threat Ref | Secure Behavior | Test Type | Automated Command | File Exists | Status |
|
|
|---------|------|------|-------------|------------|-----------------|-----------|-------------------|-------------|--------|
|
|
| *Populated during planning* | | | | | | | | | ⬜ pending |
|
|
|
|
*Status: ⬜ pending · ✅ green · ❌ red · ⚠️ flaky*
|
|
|
|
---
|
|
|
|
## Wave 0 Requirements
|
|
|
|
- [ ] react-grid-layout installation and type stubs
|
|
- [ ] Markdown editor library installation
|
|
- [ ] Calendar library installations (tsdav, node-ical)
|
|
- [ ] Dashboard API test stubs
|
|
- [ ] Calendar source API test stubs
|
|
|
|
---
|
|
|
|
## Manual-Only Verifications
|
|
|
|
| Behavior | Requirement | Why Manual | Test Instructions |
|
|
|----------|-------------|------------|-------------------|
|
|
| Drag & drop widget rearrangement | DASH-01 | Visual interaction | Open dashboard, enter edit mode, drag widget to new position |
|
|
| Widget resize | DASH-02 | Visual interaction | Enter edit mode, resize widget via drag handle |
|
|
| Calendar events display | CAL-03 | External service | Configure calendar source, verify events appear |
|
|
| Responsive grid scaling | DASH-03 | Visual breakpoints | Resize browser window, verify grid scales proportionally |
|
|
|
|
---
|
|
|
|
## Validation Sign-Off
|
|
|
|
- [ ] All tasks have `<automated>` verify or Wave 0 dependencies
|
|
- [ ] Sampling continuity: no 3 consecutive tasks without automated verify
|
|
- [ ] Wave 0 covers all MISSING references
|
|
- [ ] No watch-mode flags
|
|
- [ ] Feedback latency < 30s
|
|
- [ ] `nyquist_compliant: true` set in frontmatter
|
|
|
|
**Approval:** pending
|