Files
tessera-ctl/.planning/STATE.md
T
schalli 6bf032ef94
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 39s
Tessera CI/CD / Tests (push) Waiting to run
docs(07-01): complete DKV backend foundation plan
- 07-01-SUMMARY.md: execution record with PDF parser analysis, regex deviation, DB push method
- STATE.md: plan counter advanced to 2/6, decisions added, session updated
2026-06-26 19:39:18 +02:00

5.2 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Phase 07 Plan 01 complete 2026-06-26T17:36:00.000Z 2026-06-26 -- Phase 07 Plan 01 completed (DKV backend foundation)
total_phases completed_phases total_plans completed_plans percent
7 5 30 24 71

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-18)

Core value: Eine zentrale Plattform, in der beliebige Workflow-Tools als Module lizenziert, aktiviert und genutzt werden koennen -- ohne zwischen verschiedenen Anwendungen wechseln zu muessen. Current focus: Phase 07 — dkv-fleet-module

Current Position

Phase: 07 (dkv-fleet-module) — EXECUTING Plan: 2 of 6 Status: Executing Phase 07 (Plan 01 complete) Last activity: 2026-06-26 -- Phase 07 Plan 01 completed (DKV backend foundation)

Progress: [██████████] 100%

Performance Metrics

Velocity:

  • Total plans completed: 2
  • Average duration: 12 min
  • Total execution time: 0.38 hours

By Phase:

Phase Plans Total Avg/Plan
01-foundation-portal-shell 2/3 23 min 12 min

Recent Trend:

  • Last 5 plans: 01-01 (16 min), 01-02 (7 min)
  • Trend: improving

Updated after each plan completion | Phase 02-authentication-multi-tenancy P02 | 8min | 3 tasks | 26 files | | Phase 02-authentication-multi-tenancy P03 | 5min | 2 tasks | 20 files | | Phase 05-dashboard-calendar P01 | 14min | 4 tasks | 28 files | | Phase 05-dashboard-calendar P02 | 4min | 4 tasks | 16 files | | Phase 05-dashboard-calendar P03 | 11min | 4 tasks | 14 files | | Phase 05-dashboard-calendar PP04 | 5min | 2 tasks | 11 files | | Phase 06-desktop-client-ci-cd P01 | 5min | 2 tasks | 13 files | | Phase 06 P03 | 3min | 3 tasks | 3 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Roadmap]: 6 phases derived from 44 v1 requirements, standard granularity
  • [Roadmap]: Research recommends NestJS + Next.js + PostgreSQL RLS + Keycloak + Tauri stack
  • [01-01]: Used Traefik v2.11 instead of v3.4 due to Docker API version incompatibility on host
  • [01-01]: Traefik placed on frontend-net + backend-net for routing to both web and api services
  • [01-01]: API Dockerfile copies full monorepo node_modules structure for pnpm workspace compatibility
  • [01-02]: OKLCH color space for all design tokens (Tailwind v4 native, perceptually uniform)
  • [01-02]: Dark mode uses oklch(0.17 0.01 260) dark gray-blue for comfortable contrast with yellow primary
  • [01-02]: Cookie-based locale (NEXT_LOCALE) instead of URL routing for portal app
  • [01-02]: CSS custom property --current-sidebar-width for responsive main content margin
  • [Phase ?]: Route groups (auth)/(portal) for layout separation: auth pages standalone, portal pages wrapped in AppShell
  • [Phase ?]: Controller-level tenant isolation for ADMIN role as defense-in-depth alongside RLS
  • [Phase ?]: Remember-me controls cookie maxAge (30d session vs browser-session) not separate token type
  • [Phase ?]: react-grid-layout v2 uses dragConfig/resizeConfig instead of isDraggable/isResizable
  • [05-02]: SearchProvider defaults as constants merged with user DB rows (no seed migration)
  • [05-02]: useRef with explicit undefined initial value for React 19 strict TypeScript
  • [05-03]: DAVClient class constructor instead of createDAVClient factory (tsdav v2 type compatibility)
  • [05-03]: Dynamic imports for ews-javascript-api and @microsoft/microsoft-graph-client (lazy-load)
  • [05-03]: In-memory Map cache with 5-min TTL for calendar events (Redis not needed at current scale)
  • [05-03]: ews-javascript-api imported as any (no TypeScript definitions available)
  • [Phase ?]: Optimistic UI for calendar visibility toggle — reverts on API error
  • [Phase ?]: Auto-run testSource after adding new calendar source for immediate feedback
  • [Phase ?]: URL constructor for client-side https-only validation (T-05-14)
  • [Phase ?]: StoreExt trait import required for app.store() in Tauri 2.x
  • [Phase ?]: frontendDist=../src local page, navigate() for runtime URL override
  • [Phase ?]: CSP connect-src wildcard for configurable server URL (D-02)
  • [Phase ?]: Plain docker compose build statt build-push-action (Gitea JWT Pitfall 4)
  • [Phase ?]: Ephemeral runner mode (GITEA_RUNNER_EPHEMERAL=1) fuer Credential-Revokation pro Job
  • [Phase ?]: Separate docker-compose.ci.yml fuer opt-in CI-Infrastruktur
  • [07-01]: DKV PDF uses two extraction formats: single-tx (tab-separated) vs multi-tx (columnar) — both handled in DkvParserService
  • [07-01]: Research Pattern 4 regex replaced with empirical dual-format tab/columnar parser after testing against real invoice.pdf
  • [07-01]: CalendarCryptoService exported from CalendarModule for DKV credential encryption reuse

Pending Todos

None yet.

Blockers/Concerns

None yet.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-06-26T17:36:00.000Z Stopped at: Phase 07 Plan 01 complete (DKV backend foundation) Resume file: .planning/phases/07-dkv-fleet-module/07-02-PLAN.md