12 KiB
Roadmap: Tessera
Overview
Tessera delivers a modular portal platform where tenants activate workflow modules from a marketplace, interact through a configurable dashboard, and optionally use a desktop wrapper. The roadmap builds foundation-first (Docker + DB + shell), layers in authentication and multi-tenancy, establishes the module system with a proof-of-concept module, adds marketplace and portal navigation, delivers the dashboard experience, and wraps up with desktop client and CI/CD integration.
Phases
Phase Numbering:
- Integer phases (1, 2, 3): Planned milestone work
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
Decimal phases appear between their surrounding integers in numeric order.
- Phase 1: Foundation & Portal Shell - Docker infrastructure, database with RLS, frontend shell with i18n and theming
- Phase 2: Authentication & Multi-Tenancy - User accounts, sessions, RBAC, tenant isolation per request
- Phase 3: Module System & Domaincheck - Module SDK, registry, lazy loading, and first proof-of-concept module
- Phase 4: Marketplace & Portal Navigation - Module catalog, licensing, activation, and sidebar integration
- Phase 5: Dashboard & Calendar - Configurable widget grid with drag-and-drop, core widgets, and calendar integration (completed 2026-06-24)
- Phase 6: Desktop Client & CI/CD - Tauri wrapper for Windows/Linux and automated Gitea integration
- Phase 7: DKV Fleet Module - Automated DKV invoice processing via email monitoring, PDF parsing, and Excel export with driver mapping (completed 2026-06-27)
Phase Details
Phase 1: Foundation & Portal Shell
Goal: Users can access a running portal application with responsive layout, theme switching, and bilingual interface -- the structural frame into which all features will be placed. Mode: mvp Depends on: Nothing (first phase) Requirements: INFRA-01, INFRA-02, INFRA-03, PRTAL-01, PRTAL-04, UI-01, UI-02, UI-03 Success Criteria (what must be TRUE):
- User can access the portal in a browser served from a Docker Compose stack with PostgreSQL
- User sees a responsive layout with header (branding area) and sidebar frame that adapts to screen size
- User can toggle between light and dark theme and the preference persists
- User can switch between German and English interface language
- All UI strings are rendered through the i18n framework (no hardcoded text)
Plans: 3 plans Wave 1
- 01-01-PLAN.md -- Walking Skeleton: Monorepo + Docker Compose stack with NestJS, Next.js, PostgreSQL, Traefik
Wave 2 (blocked on Wave 1 completion)
- 01-02-PLAN.md -- Portal Shell: Design tokens, i18n (DE/EN), theme switching, responsive layout with header + sidebar
Wave 3 (blocked on Wave 2 completion)
- 01-03-PLAN.md -- Visual Verification: Human confirms portal appearance and interactions
UI hint: yes
Phase 2: Authentication & Multi-Tenancy
Goal: Users can securely log in, manage accounts, and operate within isolated tenant boundaries -- every request is scoped to the correct tenant with data fully separated at the database level. Mode: mvp Depends on: Phase 1 Requirements: AUTH-01, AUTH-02, AUTH-03, AUTH-04, AUTH-05, AUTH-06, TNNT-01, TNNT-02, TNNT-03 Success Criteria (what must be TRUE):
- Initial admin account is created automatically from Docker environment variables on first startup
- Admin can create, edit, and delete user accounts with role assignment (Admin/User)
- User can log in and log out, with session surviving browser refresh
- Admin can create and manage tenants, and each user's data is isolated per tenant via RLS
- Users can be imported from an LDAP/AD directory
Plans: 5 plans
Wave 1
- 02-01-PLAN.md -- Backend Auth Foundation: Prisma schema, RLS migration, JWT Passport auth, admin seed, tenant middleware
Wave 2 (blocked on Wave 1 completion)
- 02-02-PLAN.md -- Frontend Auth & CRUD: Login page, Next.js middleware, user/tenant management UI, auth-wired portal
- 02-03-PLAN.md -- Password Reset & Mail: SUS package verification, MailModule, password reset flow, force-change interceptor
Wave 3 (blocked on Wave 2 completion)
- 02-04-PLAN.md -- LDAP Integration: LDAP sync service, per-tenant config, field mapping, admin UI
Wave 4 (blocked on Wave 3 completion)
- 02-05-PLAN.md -- Visual Verification: Human confirms complete auth and multi-tenancy flow
UI hint: yes
Phase 3: Module System & Domaincheck
Goal: The platform can discover, register, and load modules dynamically -- validated end-to-end by a working Domaincheck module that users can interact with. Mode: mvp Depends on: Phase 2 Requirements: MOD-01, MOD-02, MOD-03, MOD-04, DCHK-01, DCHK-02, DCHK-03 Success Criteria (what must be TRUE):
- Modules are registered in a database-driven registry with a versioned SDK interface
- An admin can activate and deactivate a module without restarting the application
- Module UIs load on demand (lazy loading) -- no bundle bloat from inactive modules
- User can open the Domaincheck module, enter a domain, and see whether it is registered or available
Plans: 4 plans
Wave 1
- 03-01-PLAN.md -- Module SDK, Prisma Registry, Activation API
Wave 2 (blocked on Wave 1 completion)
- 03-02-PLAN.md -- Domaincheck Module: Backend DNS + Frontend UI
- 03-03-PLAN.md -- Lazy Loading, Category Pages, Expanded Module View
Wave 3 (blocked on Wave 2 completion)
- 03-04-PLAN.md -- Visual Verification: Human confirms module system
UI hint: yes
Phase 4: Marketplace & Portal Navigation
Goal: Users can browse available modules in a categorized marketplace, admins can activate modules per tenant, and activated modules appear in the sidebar for navigation. Mode: mvp Depends on: Phase 3 Requirements: MRKT-01, MRKT-02, MRKT-03, MRKT-04, PRTAL-02, PRTAL-03, PRTAL-05 Success Criteria (what must be TRUE):
- User can browse a marketplace view showing all available modules with descriptions and categories
- Admin can activate or deactivate modules for their tenant from the marketplace
- Only activated modules appear in the left sidebar, grouped by category
- User can select a module from the sidebar and it opens in the main content area
- User can search and filter modules in the sidebar
Plans: 4 plans
Wave 1
- 04-01-PLAN.md -- Test infra (Vitest) + marketplace i18n + Marketplace page slice: card grid browse + activate (MRKT-01/02/04)
Wave 2 (blocked on Wave 1 completion)
- 04-02-PLAN.md -- Marketplace refinements: search/category/status filters, deactivation dialog, toast, Super-Admin tenant context, module detail page
- 04-03-PLAN.md -- Sidebar enhancement: Next.js Link + usePathname active state, per-module links, sidebar search, live refresh (PRTAL-02/03/05, MRKT-03)
Wave 3 (blocked on Wave 2 completion)
- 04-04-PLAN.md -- Visual Verification: Human confirms marketplace, activation, tenant context, and sidebar navigation
UI hint: yes
Phase 5: Dashboard & Calendar
Goal: Users have a personal, configurable start page with freely arrangeable widgets -- including clock, search, notes, and calendar with external calendar source integration. Mode: mvp Depends on: Phase 4 Requirements: DASH-01, DASH-02, DASH-03, DASH-04, DASH-05, DASH-06, DASH-07, CAL-01, CAL-02, CAL-03 Success Criteria (what must be TRUE):
- User sees a configurable dashboard as their start page with a drag-and-drop grid
- User can add, reposition, and resize widgets (clock, search bar, calendar, notes)
- Dashboard layout is saved per user and restored on next login
- User can configure external calendar sources (WebDAV, Exchange, ICS) in settings
- Calendar widget shows upcoming events from selected calendar sources
Plans: 5 plans
Wave 1
- 05-01-PLAN.md -- Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell, header link, i18n (DASH-01/02/03/07)
Wave 2 (blocked on Wave 1 completion)
- 05-02-PLAN.md -- Search + Notes widgets, widget settings panel, SearchProvider backend (DASH-04/06)
Wave 3 (blocked on Wave 2 completion)
- 05-03-PLAN.md -- Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (CAL-01/02/03, DASH-05)
Wave 4 (blocked on Wave 3 completion)
- 05-04-PLAN.md -- Calendar frontend: calendar widget, calendar settings page, API client (CAL-01/02/03, DASH-05)
Wave 5 (blocked on Wave 4 completion)
- 05-05-PLAN.md -- Visual Verification: Human confirms dashboard, widgets, calendar, settings
UI hint: yes
Phase 6: Desktop Client & CI/CD
Goal: Users can install and run Tessera as a native desktop application, and the development workflow includes automated version control via Gitea. Mode: mvp Depends on: Phase 5 Requirements: DESK-01, DESK-02, INFRA-04 Success Criteria (what must be TRUE):
- User can install a Tauri-based desktop app on Windows or Linux
- Desktop app connects to the existing web backend (no standalone server)
- Code changes are automatically committed and pushed to Gitea with minimal manual intervention
Plans: 3 plans
Wave 1 (parallel — disjoint files)
- 06-01-PLAN.md -- Desktop foundation: Tauri toolchain, apps/desktop scaffold, URL-loading WebView + first-run server URL setup (DESK-01/02)
- 06-03-PLAN.md -- CI/CD: Gitea remote, act_runner, multi-stage Gitea Actions pipeline (lint+type-check -> tests -> docker build+deploy) (INFRA-04)
Wave 2 (blocked on 06-01)
- 06-02-PLAN.md -- Desktop native: tray + close-to-tray, window-state, autostart, notifications + version check, branded icon, AppImage+NSIS bundles, /health/version API (DESK-01/02)
Phase 7: DKV Fleet Module
Goal: Administrators can automatically process DKV fuel card invoices by monitoring an email inbox, parsing PDF attachments, mapping license plates to drivers, and exporting structured Excel reports via SMTP. Mode: mvp Depends on: Phase 6 Requirements: DKV-01, DKV-02, DKV-03, DKV-04, DKV-05 Success Criteria (what must be TRUE):
- System automatically detects DKV invoice PDFs from a configured email inbox (IMAP or Exchange)
- All transactions are parsed per vehicle with: date, service station, km reading, product, quantity, unit, net/gross amounts
- License plate → driver mapping is importable as CSV and manually editable in the UI
- Processed data is exported as Excel file and sent to a configurable recipient via SMTP
- SMTP settings are configurable in general settings (shared with other modules)
- Module configuration (inbox, sender filter, folder, recipient) is editable in the module settings UI
Plans: 6 plans
Wave 0
- 07-01-PLAN.md -- Backend foundation: deps install, Prisma models, ScheduleModule, crypto export, validated DKV PDF parser (DKV-02)
Wave 1 (blocked on Wave 0 completion)
- 07-02-PLAN.md -- Inbox-access layer: InboxProvider interface, IMAP + Exchange providers, config/vehicle/history DTOs (DKV-01)
- 07-03-PLAN.md -- Export + delivery + SMTP backend: SettingsModule (SMTP CRUD + test), DkvExportService (xlsx + prune), DkvMailService, MailModule DB-SMTP migration (DKV-04/05, D-06)
Wave 2 (blocked on Wave 1 completion)
- 07-04-PLAN.md -- Pipeline integration: DkvService orchestration, dynamic scheduler, DkvController REST, module registry seed, i18n keys (DKV-01/03/04/05)
- 07-05-PLAN.md -- Module frontend: dkv-api client, main page (history + export download + "Jetzt prüfen"), inbox settings form, vehicle CRUD + CSV import (DKV-01/03/04)
- 07-06-PLAN.md -- SMTP settings frontend: settings-api client, SMTP config form + connection test, settings-sidebar "Allgemein" category (DKV-05)
UI hint: yes
Progress
Execution Order: Phases execute in numeric order: 1 -> 2 -> 3 -> 4 -> 5 -> 6 -> 7
| Phase | Plans Complete | Status | Completed |
|---|---|---|---|
| 1. Foundation & Portal Shell | 2/3 | In Progress | - |
| 2. Authentication & Multi-Tenancy | 2/5 | In Progress | |
| 3. Module System & Domaincheck | 3/4 | In Progress | |
| 4. Marketplace & Portal Navigation | 0/4 | Not started | - |
| 5. Dashboard & Calendar | 5/5 | Complete | 2026-06-24 |
| 6. Desktop Client & CI/CD | 2/3 | In Progress | |
| 7. DKV Fleet Module | 6/6 | Complete | 2026-06-27 |