95423497ad
- 06-01: Tauri scaffold complete - 06-02: Native features (tray, window-state, autostart, version check, AppImage) - 06-03: Gitea CI/CD pipeline green (Run #89 — all 3 jobs pass) - Clean up handoff and continue-here files - Update STATE.md to 100% (all 6 phases complete) Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
121 lines
4.8 KiB
Markdown
121 lines
4.8 KiB
Markdown
---
|
|
gsd_state_version: 1.0
|
|
milestone: v1.0
|
|
milestone_name: milestone
|
|
status: complete
|
|
stopped_at: all phases complete
|
|
last_updated: "2026-06-25T12:00:00.000Z"
|
|
last_activity: 2026-06-25 -- Phase 06 all plans complete
|
|
progress:
|
|
total_phases: 6
|
|
completed_phases: 6
|
|
total_plans: 24
|
|
completed_plans: 24
|
|
percent: 100
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-06-18)
|
|
|
|
**Core value:** Eine zentrale Plattform, in der beliebige Workflow-Tools als Module lizenziert, aktiviert und genutzt werden koennen -- ohne zwischen verschiedenen Anwendungen wechseln zu muessen.
|
|
**Current focus:** Phase 06 — desktop-client-ci-cd
|
|
|
|
## Current Position
|
|
|
|
Phase: 06 (desktop-client-ci-cd) — COMPLETE
|
|
Plan: 3 of 3
|
|
Status: All plans complete
|
|
Last activity: 2026-06-25 -- Phase 06 complete (CI green, AppImage built)
|
|
|
|
Progress: [██████████] 100%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
|
|
- Total plans completed: 2
|
|
- Average duration: 12 min
|
|
- Total execution time: 0.38 hours
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| 01-foundation-portal-shell | 2/3 | 23 min | 12 min |
|
|
|
|
**Recent Trend:**
|
|
|
|
- Last 5 plans: 01-01 (16 min), 01-02 (7 min)
|
|
- Trend: improving
|
|
|
|
*Updated after each plan completion*
|
|
| Phase 02-authentication-multi-tenancy P02 | 8min | 3 tasks | 26 files |
|
|
| Phase 02-authentication-multi-tenancy P03 | 5min | 2 tasks | 20 files |
|
|
| Phase 05-dashboard-calendar P01 | 14min | 4 tasks | 28 files |
|
|
| Phase 05-dashboard-calendar P02 | 4min | 4 tasks | 16 files |
|
|
| Phase 05-dashboard-calendar P03 | 11min | 4 tasks | 14 files |
|
|
| Phase 05-dashboard-calendar PP04 | 5min | 2 tasks | 11 files |
|
|
| Phase 06-desktop-client-ci-cd P01 | 5min | 2 tasks | 13 files |
|
|
| Phase 06 P03 | 3min | 3 tasks | 3 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- [Roadmap]: 6 phases derived from 44 v1 requirements, standard granularity
|
|
- [Roadmap]: Research recommends NestJS + Next.js + PostgreSQL RLS + Keycloak + Tauri stack
|
|
- [01-01]: Used Traefik v2.11 instead of v3.4 due to Docker API version incompatibility on host
|
|
- [01-01]: Traefik placed on frontend-net + backend-net for routing to both web and api services
|
|
- [01-01]: API Dockerfile copies full monorepo node_modules structure for pnpm workspace compatibility
|
|
- [01-02]: OKLCH color space for all design tokens (Tailwind v4 native, perceptually uniform)
|
|
- [01-02]: Dark mode uses oklch(0.17 0.01 260) dark gray-blue for comfortable contrast with yellow primary
|
|
- [01-02]: Cookie-based locale (NEXT_LOCALE) instead of URL routing for portal app
|
|
- [01-02]: CSS custom property --current-sidebar-width for responsive main content margin
|
|
- [Phase ?]: Route groups (auth)/(portal) for layout separation: auth pages standalone, portal pages wrapped in AppShell
|
|
- [Phase ?]: Controller-level tenant isolation for ADMIN role as defense-in-depth alongside RLS
|
|
- [Phase ?]: Remember-me controls cookie maxAge (30d session vs browser-session) not separate token type
|
|
- [Phase ?]: react-grid-layout v2 uses dragConfig/resizeConfig instead of isDraggable/isResizable
|
|
- [05-02]: SearchProvider defaults as constants merged with user DB rows (no seed migration)
|
|
- [05-02]: useRef with explicit undefined initial value for React 19 strict TypeScript
|
|
- [05-03]: DAVClient class constructor instead of createDAVClient factory (tsdav v2 type compatibility)
|
|
- [05-03]: Dynamic imports for ews-javascript-api and @microsoft/microsoft-graph-client (lazy-load)
|
|
- [05-03]: In-memory Map cache with 5-min TTL for calendar events (Redis not needed at current scale)
|
|
- [05-03]: ews-javascript-api imported as any (no TypeScript definitions available)
|
|
- [Phase ?]: Optimistic UI for calendar visibility toggle — reverts on API error
|
|
- [Phase ?]: Auto-run testSource after adding new calendar source for immediate feedback
|
|
- [Phase ?]: URL constructor for client-side https-only validation (T-05-14)
|
|
- [Phase ?]: StoreExt trait import required for app.store() in Tauri 2.x
|
|
- [Phase ?]: frontendDist=../src local page, navigate() for runtime URL override
|
|
- [Phase ?]: CSP connect-src wildcard for configurable server URL (D-02)
|
|
- [Phase ?]: Plain docker compose build statt build-push-action (Gitea JWT Pitfall 4)
|
|
- [Phase ?]: Ephemeral runner mode (GITEA_RUNNER_EPHEMERAL=1) fuer Credential-Revokation pro Job
|
|
- [Phase ?]: Separate docker-compose.ci.yml fuer opt-in CI-Infrastruktur
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
None yet.
|
|
|
|
## Deferred Items
|
|
|
|
Items acknowledged and carried forward from previous milestone close:
|
|
|
|
| Category | Item | Status | Deferred At |
|
|
|----------|------|--------|-------------|
|
|
| *(none)* | | | |
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-06-25T12:00:00Z
|
|
Stopped at: All 6 phases complete — v1.0 milestone done
|
|
Resume file: None
|