Files
tessera-ctl/.planning/STATE.md
T
schalli 95423497ad
Tessera CI/CD / Lint & Type Check (push) Successful in 46s
Tessera CI/CD / Tests (push) Successful in 45s
Tessera CI/CD / Build & Deploy (push) Successful in 39s
docs(06): complete Phase 06 — desktop wrapper + CI/CD pipeline verified
- 06-01: Tauri scaffold complete
- 06-02: Native features (tray, window-state, autostart, version check, AppImage)
- 06-03: Gitea CI/CD pipeline green (Run #89 — all 3 jobs pass)
- Clean up handoff and continue-here files
- Update STATE.md to 100% (all 6 phases complete)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 14:09:17 +02:00

121 lines
4.8 KiB
Markdown

---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: complete
stopped_at: all phases complete
last_updated: "2026-06-25T12:00:00.000Z"
last_activity: 2026-06-25 -- Phase 06 all plans complete
progress:
total_phases: 6
completed_phases: 6
total_plans: 24
completed_plans: 24
percent: 100
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-06-18)
**Core value:** Eine zentrale Plattform, in der beliebige Workflow-Tools als Module lizenziert, aktiviert und genutzt werden koennen -- ohne zwischen verschiedenen Anwendungen wechseln zu muessen.
**Current focus:** Phase 06 — desktop-client-ci-cd
## Current Position
Phase: 06 (desktop-client-ci-cd) — COMPLETE
Plan: 3 of 3
Status: All plans complete
Last activity: 2026-06-25 -- Phase 06 complete (CI green, AppImage built)
Progress: [██████████] 100%
## Performance Metrics
**Velocity:**
- Total plans completed: 2
- Average duration: 12 min
- Total execution time: 0.38 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 01-foundation-portal-shell | 2/3 | 23 min | 12 min |
**Recent Trend:**
- Last 5 plans: 01-01 (16 min), 01-02 (7 min)
- Trend: improving
*Updated after each plan completion*
| Phase 02-authentication-multi-tenancy P02 | 8min | 3 tasks | 26 files |
| Phase 02-authentication-multi-tenancy P03 | 5min | 2 tasks | 20 files |
| Phase 05-dashboard-calendar P01 | 14min | 4 tasks | 28 files |
| Phase 05-dashboard-calendar P02 | 4min | 4 tasks | 16 files |
| Phase 05-dashboard-calendar P03 | 11min | 4 tasks | 14 files |
| Phase 05-dashboard-calendar PP04 | 5min | 2 tasks | 11 files |
| Phase 06-desktop-client-ci-cd P01 | 5min | 2 tasks | 13 files |
| Phase 06 P03 | 3min | 3 tasks | 3 files |
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- [Roadmap]: 6 phases derived from 44 v1 requirements, standard granularity
- [Roadmap]: Research recommends NestJS + Next.js + PostgreSQL RLS + Keycloak + Tauri stack
- [01-01]: Used Traefik v2.11 instead of v3.4 due to Docker API version incompatibility on host
- [01-01]: Traefik placed on frontend-net + backend-net for routing to both web and api services
- [01-01]: API Dockerfile copies full monorepo node_modules structure for pnpm workspace compatibility
- [01-02]: OKLCH color space for all design tokens (Tailwind v4 native, perceptually uniform)
- [01-02]: Dark mode uses oklch(0.17 0.01 260) dark gray-blue for comfortable contrast with yellow primary
- [01-02]: Cookie-based locale (NEXT_LOCALE) instead of URL routing for portal app
- [01-02]: CSS custom property --current-sidebar-width for responsive main content margin
- [Phase ?]: Route groups (auth)/(portal) for layout separation: auth pages standalone, portal pages wrapped in AppShell
- [Phase ?]: Controller-level tenant isolation for ADMIN role as defense-in-depth alongside RLS
- [Phase ?]: Remember-me controls cookie maxAge (30d session vs browser-session) not separate token type
- [Phase ?]: react-grid-layout v2 uses dragConfig/resizeConfig instead of isDraggable/isResizable
- [05-02]: SearchProvider defaults as constants merged with user DB rows (no seed migration)
- [05-02]: useRef with explicit undefined initial value for React 19 strict TypeScript
- [05-03]: DAVClient class constructor instead of createDAVClient factory (tsdav v2 type compatibility)
- [05-03]: Dynamic imports for ews-javascript-api and @microsoft/microsoft-graph-client (lazy-load)
- [05-03]: In-memory Map cache with 5-min TTL for calendar events (Redis not needed at current scale)
- [05-03]: ews-javascript-api imported as any (no TypeScript definitions available)
- [Phase ?]: Optimistic UI for calendar visibility toggle — reverts on API error
- [Phase ?]: Auto-run testSource after adding new calendar source for immediate feedback
- [Phase ?]: URL constructor for client-side https-only validation (T-05-14)
- [Phase ?]: StoreExt trait import required for app.store() in Tauri 2.x
- [Phase ?]: frontendDist=../src local page, navigate() for runtime URL override
- [Phase ?]: CSP connect-src wildcard for configurable server URL (D-02)
- [Phase ?]: Plain docker compose build statt build-push-action (Gitea JWT Pitfall 4)
- [Phase ?]: Ephemeral runner mode (GITEA_RUNNER_EPHEMERAL=1) fuer Credential-Revokation pro Job
- [Phase ?]: Separate docker-compose.ci.yml fuer opt-in CI-Infrastruktur
### Pending Todos
None yet.
### Blockers/Concerns
None yet.
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none)* | | | |
## Session Continuity
Last session: 2026-06-25T12:00:00Z
Stopped at: All 6 phases complete — v1.0 milestone done
Resume file: None