wip: phase 05 complete, pause work

This commit is contained in:
2026-06-24 22:41:29 +02:00
parent 8a55806a35
commit ed410eb268
@@ -3,82 +3,48 @@ context: phase
phase: 05-dashboard-calendar
task: null
total_tasks: null
status: planning_revision
last_updated: 2026-06-24T07:53:36.605Z
status: complete
last_updated: 2026-06-24T20:40:58.014Z
---
<current_state>
Phase 05 plan-phase workflow, mid-revision loop (iteration 1/3).
Planner created initial 4 plans → checker found 2 blockers → planner revised (split 05-03) → produced 5 plans on disk. Checker has NOT yet verified revised plans.
5 plans on disk:
- 05-01-PLAN.md — Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell (Wave 1) [DASH-01/02/03/07]
- 05-02-PLAN.md — Search + Notes widgets, widget settings panel, SearchProvider backend (Wave 2) [DASH-04/06]
- 05-03-PLAN.md — Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (Wave 3) [CAL-01/02/03, DASH-05]
- 05-04-PLAN.md — Calendar frontend: event aggregation, calendar widget, settings UI (Wave 3, depends on 05-03) [CAL-01/02/03, DASH-05]
- 05-05-PLAN.md — Visual verification checkpoint (Wave 4) [all 10 reqs]
Phase 05 Dashboard & Calendar is COMPLETE. All 5 plans executed, verified, and approved by human.
ROADMAP status updated to Complete. No remaining work in this phase.
</current_state>
<completed_work>
Session Work (2026-06-23):
- UI-SPEC.md: Created and verified (6/6 dimensions passed, 1 revision for typography)
- RESEARCH.md: Created (react-grid-layout v2, tsdav/node-ical/ews for calendar, @uiw/react-md-editor for notes, AES-256-GCM for credential encryption)
- VALIDATION.md: Draft created
- PATTERNS.md: Created (30 files classified, 24 analogs found)
- Initial 4 plans: Created by gsd-planner (opus)
- Plan checker v1: Found 2 blockers (05-03 missing requirements frontmatter, 05-03 scope 5 tasks/20 files too large)
- Planner revision: Split 05-03 into backend (05-03) + frontend (05-04), renamed old 05-04 verification to 05-05
Session Work (2026-06-24):
- Plan-phase finalized: checker verification, wave fix (05-04 wave 3→4, 05-05 wave 4→5), ROADMAP corrected (was showing 4 plans, Phase 6 had stale 05-xx refs), all gates passed (10/10 reqs, 22/22 decisions, 32/32 gap analysis)
- 05-01 executed: Dashboard foundation — Prisma models, CRUD API, react-grid-layout grid, ClockWidget, widget-registry, Zustand store, settings shell, header link, i18n (5 commits)
- 05-02 executed: Search + Notes widgets, SearchProvider backend, widget settings panel (5 commits, session limit interrupted — continued with fresh agent)
- 05-03 executed: Calendar backend — CalendarSource model, AES-256-GCM CryptoService, CalDAV/ICS/Exchange providers, event aggregation with cache (5 commits)
- 05-04 executed: Calendar frontend — calendar widget, settings UI, API client (5 commits)
- 05-05 verified: Pre-flight (46 tests green, tsc clean), human checkpoint approved after 2 fixes
- Fix: CALENDAR_ENCRYPTION_KEY dev default added to docker-compose.yml
- Fix: i18n flat dot-keys converted to nested structure for next-intl compatibility
</completed_work>
<remaining_work>
Plan-phase workflow steps remaining:
1. Re-run gsd-plan-checker on all 5 revised plans (step 10)
2. Handle checker return (step 11)
3. If passes → requirements coverage gate (step 13)
4. Decision coverage gate (step 13a)
5. Record planning in STATE.md (step 13b)
6. Annotate ROADMAP wave dependencies (step 13c)
7. Commit all plans (step 13d)
8. Post-planning gap analysis (step 13e)
9. Present final status and next steps (step 14)
No remaining work for Phase 05. Next milestone work:
- Phase 06: Desktop Client & CI/CD (not yet planned — run /gsd-plan-phase 06)
</remaining_work>
<decisions_made>
- Split 05-03 into backend/frontend plans — checker found 5 tasks/20 files in complex calendar domain exceeded scope sanity
- MVP vertical-slice mode — per ROADMAP **Mode:** mvp
- UI-SPEC: 4 font sizes (12/14/18/28px), 2 weights (400/600) — reduced from 7 sizes/3 weights after checker blocked
- Schema push: [BLOCKING] Prisma db push task injected in each schema-modifying plan
- Security: ASVS L1 threat models required in each plan
- Worktree isolation degraded to sequential (origin/HEAD unresolvable) — all plans ran sequentially on main tree
- CALENDAR_ENCRYPTION_KEY: generated dev default hardcoded in docker-compose.yml fallback (production should use .env)
- i18n structure: converted flat dot-keys to nested objects (next-intl requires nested for useTranslations namespace scoping)
</decisions_made>
<blockers>
None — revision produced files, just needs verification pass.
None.
</blockers>
## Required Reading (in order)
1. `.planning/phases/05-dashboard-calendar/05-CONTEXT.md` — 22 locked decisions (D-01..D-22)
2. `.planning/phases/05-dashboard-calendar/05-RESEARCH.md` — Tech stack decisions, library choices
3. `.planning/phases/05-dashboard-calendar/05-UI-SPEC.md` — Visual/interaction contracts
4. `.planning/phases/05-dashboard-calendar/05-*-PLAN.md` — All 5 plan files
5. `$HOME/.claude/gsd-core/workflows/plan-phase.md` — Workflow definition (steps 10-14 remain)
## Infrastructure State
- No servers running
- No background processes
- Docker stack not started for this phase yet
<context>
Plan-phase orchestrator role. Was executing the plan-phase workflow from gsd-core/workflows/plan-phase.md.
Revision iteration 1 of max 3. prev_issue_count=2 (blockers). stall_reentry_count=0.
The planner agent hit its session token limit during revision but still wrote the split files to disk successfully.
Uncommitted files: 05-04-PLAN.md (modified), 05-05-PLAN.md (new), 05-PATTERNS.md (new), 05-VALIDATION.md (new).
</context>
- Docker stack running (api healthy, db healthy, web up)
- CALENDAR_ENCRYPTION_KEY set via docker-compose.yml dev default
- 46 web tests passing, API tsc clean
<next_action>
Start with: Spawn gsd-plan-checker agent on all 5 plans (.planning/phases/05-dashboard-calendar/05-0[1-5]-PLAN.md). If verification passes, proceed through steps 13→14 to finalize planning. If issues found, iterate (revision count 2/3).
Alternatively: run `/gsd-plan-phase 05` which will detect existing plans and offer to continue.
Run `/gsd-plan-phase 06` to plan Phase 6: Desktop Client & CI/CD (Tauri wrapper + Gitea integration).
</next_action>