wip: phase 05 complete, pause work
This commit is contained in:
@@ -3,82 +3,48 @@ context: phase
|
|||||||
phase: 05-dashboard-calendar
|
phase: 05-dashboard-calendar
|
||||||
task: null
|
task: null
|
||||||
total_tasks: null
|
total_tasks: null
|
||||||
status: planning_revision
|
status: complete
|
||||||
last_updated: 2026-06-24T07:53:36.605Z
|
last_updated: 2026-06-24T20:40:58.014Z
|
||||||
---
|
---
|
||||||
|
|
||||||
<current_state>
|
<current_state>
|
||||||
Phase 05 plan-phase workflow, mid-revision loop (iteration 1/3).
|
Phase 05 Dashboard & Calendar is COMPLETE. All 5 plans executed, verified, and approved by human.
|
||||||
|
ROADMAP status updated to Complete. No remaining work in this phase.
|
||||||
Planner created initial 4 plans → checker found 2 blockers → planner revised (split 05-03) → produced 5 plans on disk. Checker has NOT yet verified revised plans.
|
|
||||||
|
|
||||||
5 plans on disk:
|
|
||||||
- 05-01-PLAN.md — Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell (Wave 1) [DASH-01/02/03/07]
|
|
||||||
- 05-02-PLAN.md — Search + Notes widgets, widget settings panel, SearchProvider backend (Wave 2) [DASH-04/06]
|
|
||||||
- 05-03-PLAN.md — Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (Wave 3) [CAL-01/02/03, DASH-05]
|
|
||||||
- 05-04-PLAN.md — Calendar frontend: event aggregation, calendar widget, settings UI (Wave 3, depends on 05-03) [CAL-01/02/03, DASH-05]
|
|
||||||
- 05-05-PLAN.md — Visual verification checkpoint (Wave 4) [all 10 reqs]
|
|
||||||
</current_state>
|
</current_state>
|
||||||
|
|
||||||
<completed_work>
|
<completed_work>
|
||||||
|
|
||||||
Session Work (2026-06-23):
|
Session Work (2026-06-24):
|
||||||
- UI-SPEC.md: Created and verified (6/6 dimensions passed, 1 revision for typography)
|
- Plan-phase finalized: checker verification, wave fix (05-04 wave 3→4, 05-05 wave 4→5), ROADMAP corrected (was showing 4 plans, Phase 6 had stale 05-xx refs), all gates passed (10/10 reqs, 22/22 decisions, 32/32 gap analysis)
|
||||||
- RESEARCH.md: Created (react-grid-layout v2, tsdav/node-ical/ews for calendar, @uiw/react-md-editor for notes, AES-256-GCM for credential encryption)
|
- 05-01 executed: Dashboard foundation — Prisma models, CRUD API, react-grid-layout grid, ClockWidget, widget-registry, Zustand store, settings shell, header link, i18n (5 commits)
|
||||||
- VALIDATION.md: Draft created
|
- 05-02 executed: Search + Notes widgets, SearchProvider backend, widget settings panel (5 commits, session limit interrupted — continued with fresh agent)
|
||||||
- PATTERNS.md: Created (30 files classified, 24 analogs found)
|
- 05-03 executed: Calendar backend — CalendarSource model, AES-256-GCM CryptoService, CalDAV/ICS/Exchange providers, event aggregation with cache (5 commits)
|
||||||
- Initial 4 plans: Created by gsd-planner (opus)
|
- 05-04 executed: Calendar frontend — calendar widget, settings UI, API client (5 commits)
|
||||||
- Plan checker v1: Found 2 blockers (05-03 missing requirements frontmatter, 05-03 scope 5 tasks/20 files too large)
|
- 05-05 verified: Pre-flight (46 tests green, tsc clean), human checkpoint approved after 2 fixes
|
||||||
- Planner revision: Split 05-03 into backend (05-03) + frontend (05-04), renamed old 05-04 verification to 05-05
|
- Fix: CALENDAR_ENCRYPTION_KEY dev default added to docker-compose.yml
|
||||||
|
- Fix: i18n flat dot-keys converted to nested structure for next-intl compatibility
|
||||||
</completed_work>
|
</completed_work>
|
||||||
|
|
||||||
<remaining_work>
|
<remaining_work>
|
||||||
|
No remaining work for Phase 05. Next milestone work:
|
||||||
Plan-phase workflow steps remaining:
|
- Phase 06: Desktop Client & CI/CD (not yet planned — run /gsd-plan-phase 06)
|
||||||
1. Re-run gsd-plan-checker on all 5 revised plans (step 10)
|
|
||||||
2. Handle checker return (step 11)
|
|
||||||
3. If passes → requirements coverage gate (step 13)
|
|
||||||
4. Decision coverage gate (step 13a)
|
|
||||||
5. Record planning in STATE.md (step 13b)
|
|
||||||
6. Annotate ROADMAP wave dependencies (step 13c)
|
|
||||||
7. Commit all plans (step 13d)
|
|
||||||
8. Post-planning gap analysis (step 13e)
|
|
||||||
9. Present final status and next steps (step 14)
|
|
||||||
</remaining_work>
|
</remaining_work>
|
||||||
|
|
||||||
<decisions_made>
|
<decisions_made>
|
||||||
|
- Worktree isolation degraded to sequential (origin/HEAD unresolvable) — all plans ran sequentially on main tree
|
||||||
- Split 05-03 into backend/frontend plans — checker found 5 tasks/20 files in complex calendar domain exceeded scope sanity
|
- CALENDAR_ENCRYPTION_KEY: generated dev default hardcoded in docker-compose.yml fallback (production should use .env)
|
||||||
- MVP vertical-slice mode — per ROADMAP **Mode:** mvp
|
- i18n structure: converted flat dot-keys to nested objects (next-intl requires nested for useTranslations namespace scoping)
|
||||||
- UI-SPEC: 4 font sizes (12/14/18/28px), 2 weights (400/600) — reduced from 7 sizes/3 weights after checker blocked
|
|
||||||
- Schema push: [BLOCKING] Prisma db push task injected in each schema-modifying plan
|
|
||||||
- Security: ASVS L1 threat models required in each plan
|
|
||||||
</decisions_made>
|
</decisions_made>
|
||||||
|
|
||||||
<blockers>
|
<blockers>
|
||||||
None — revision produced files, just needs verification pass.
|
None.
|
||||||
</blockers>
|
</blockers>
|
||||||
|
|
||||||
## Required Reading (in order)
|
|
||||||
1. `.planning/phases/05-dashboard-calendar/05-CONTEXT.md` — 22 locked decisions (D-01..D-22)
|
|
||||||
2. `.planning/phases/05-dashboard-calendar/05-RESEARCH.md` — Tech stack decisions, library choices
|
|
||||||
3. `.planning/phases/05-dashboard-calendar/05-UI-SPEC.md` — Visual/interaction contracts
|
|
||||||
4. `.planning/phases/05-dashboard-calendar/05-*-PLAN.md` — All 5 plan files
|
|
||||||
5. `$HOME/.claude/gsd-core/workflows/plan-phase.md` — Workflow definition (steps 10-14 remain)
|
|
||||||
|
|
||||||
## Infrastructure State
|
## Infrastructure State
|
||||||
- No servers running
|
- Docker stack running (api healthy, db healthy, web up)
|
||||||
- No background processes
|
- CALENDAR_ENCRYPTION_KEY set via docker-compose.yml dev default
|
||||||
- Docker stack not started for this phase yet
|
- 46 web tests passing, API tsc clean
|
||||||
|
|
||||||
<context>
|
|
||||||
Plan-phase orchestrator role. Was executing the plan-phase workflow from gsd-core/workflows/plan-phase.md.
|
|
||||||
Revision iteration 1 of max 3. prev_issue_count=2 (blockers). stall_reentry_count=0.
|
|
||||||
The planner agent hit its session token limit during revision but still wrote the split files to disk successfully.
|
|
||||||
Uncommitted files: 05-04-PLAN.md (modified), 05-05-PLAN.md (new), 05-PATTERNS.md (new), 05-VALIDATION.md (new).
|
|
||||||
</context>
|
|
||||||
|
|
||||||
<next_action>
|
<next_action>
|
||||||
Start with: Spawn gsd-plan-checker agent on all 5 plans (.planning/phases/05-dashboard-calendar/05-0[1-5]-PLAN.md). If verification passes, proceed through steps 13→14 to finalize planning. If issues found, iterate (revision count 2/3).
|
Run `/gsd-plan-phase 06` to plan Phase 6: Desktop Client & CI/CD (Tauri wrapper + Gitea integration).
|
||||||
Alternatively: run `/gsd-plan-phase 05` which will detect existing plans and offer to continue.
|
|
||||||
</next_action>
|
</next_action>
|
||||||
|
|||||||
Reference in New Issue
Block a user