phase: 05-dashboard-calendar phase: 05-dashboard-calendar
task: null task: null
total_tasks: null total_tasks: null
status: planning_revision status: complete
last_updated: 2026-06-24T07:53:36.605Z last_updated: 2026-06-24T20:40:58.014Z
--- ---
<current_state> <current_state>
Phase 05 plan-phase workflow, mid-revision loop (iteration 1/3). Phase 05 Dashboard & Calendar is COMPLETE. All 5 plans executed, verified, and approved by human.
ROADMAP status updated to Complete. No remaining work in this phase.
Planner created initial 4 plans → checker found 2 blockers → planner revised (split 05-03) → produced 5 plans on disk. Checker has NOT yet verified revised plans.
5 plans on disk:
- 05-01-PLAN.md — Dashboard foundation: Prisma models, CRUD API, grid, edit-mode, clock widget, settings shell (Wave 1) [DASH-01/02/03/07]
- 05-02-PLAN.md — Search + Notes widgets, widget settings panel, SearchProvider backend (Wave 2) [DASH-04/06]
- 05-03-PLAN.md — Calendar backend: Prisma model, AES-256-GCM crypto, source CRUD, CalDAV/ICS/Exchange providers, DB push (Wave 3) [CAL-01/02/03, DASH-05]
- 05-04-PLAN.md — Calendar frontend: event aggregation, calendar widget, settings UI (Wave 3, depends on 05-03) [CAL-01/02/03, DASH-05]
- 05-05-PLAN.md — Visual verification checkpoint (Wave 4) [all 10 reqs]
</current_state> </current_state>
<completed_work> <completed_work>
Session Work (2026-06-23): Session Work (2026-06-24):
- UI-SPEC.md: Created and verified (6/6 dimensions passed, 1 revision for typography) - Plan-phase finalized: checker verification, wave fix (05-04 wave 3→4, 05-05 wave 4→5), ROADMAP corrected (was showing 4 plans, Phase 6 had stale 05-xx refs), all gates passed (10/10 reqs, 22/22 decisions, 32/32 gap analysis)
- RESEARCH.md: Created (react-grid-layout v2, tsdav/node-ical/ews for calendar, @uiw/react-md-editor for notes, AES-256-GCM for credential encryption) - 05-01 executed: Dashboard foundation — Prisma models, CRUD API, react-grid-layout grid, ClockWidget, widget-registry, Zustand store, settings shell, header link, i18n (5 commits)
- VALIDATION.md: Draft created - 05-02 executed: Search + Notes widgets, SearchProvider backend, widget settings panel (5 commits, session limit interrupted — continued with fresh agent)
- PATTERNS.md: Created (30 files classified, 24 analogs found) - 05-03 executed: Calendar backend — CalendarSource model, AES-256-GCM CryptoService, CalDAV/ICS/Exchange providers, event aggregation with cache (5 commits)
- Initial 4 plans: Created by gsd-planner (opus) - 05-04 executed: Calendar frontend — calendar widget, settings UI, API client (5 commits)
- Plan checker v1: Found 2 blockers (05-03 missing requirements frontmatter, 05-03 scope 5 tasks/20 files too large) - 05-05 verified: Pre-flight (46 tests green, tsc clean), human checkpoint approved after 2 fixes
- Planner revision: Split 05-03 into backend (05-03) + frontend (05-04), renamed old 05-04 verification to 05-05 - Fix: CALENDAR_ENCRYPTION_KEY dev default added to docker-compose.yml
- Fix: i18n flat dot-keys converted to nested structure for next-intl compatibility
</completed_work> </completed_work>
<remaining_work> <remaining_work>
No remaining work for Phase 05. Next milestone work:
Plan-phase workflow steps remaining: - Phase 06: Desktop Client & CI/CD (not yet planned — run /gsd-plan-phase 06)
1. Re-run gsd-plan-checker on all 5 revised plans (step 10)
2. Handle checker return (step 11)
3. If passes → requirements coverage gate (step 13)
4. Decision coverage gate (step 13a)
5. Record planning in STATE.md (step 13b)
6. Annotate ROADMAP wave dependencies (step 13c)
7. Commit all plans (step 13d)
8. Post-planning gap analysis (step 13e)
9. Present final status and next steps (step 14)
</remaining_work> </remaining_work>
<decisions_made> <decisions_made>
- Worktree isolation degraded to sequential (origin/HEAD unresolvable) — all plans ran sequentially on main tree
- Split 05-03 into backend/frontend plans — checker found 5 tasks/20 files in complex calendar domain exceeded scope sanity - CALENDAR_ENCRYPTION_KEY: generated dev default hardcoded in docker-compose.yml fallback (production should use .env)
- MVP vertical-slice mode — per ROADMAP **Mode:** mvp - i18n structure: converted flat dot-keys to nested objects (next-intl requires nested for useTranslations namespace scoping)
- UI-SPEC: 4 font sizes (12/14/18/28px), 2 weights (400/600) — reduced from 7 sizes/3 weights after checker blocked
- Schema push: [BLOCKING] Prisma db push task injected in each schema-modifying plan
- Security: ASVS L1 threat models required in each plan
</decisions_made> </decisions_made>
<blockers> <blockers>
None — revision produced files, just needs verification pass. None.
</blockers> </blockers>
## Required Reading (in order)
1. `.planning/phases/05-dashboard-calendar/05-CONTEXT.md` — 22 locked decisions (D-01..D-22)
2. `.planning/phases/05-dashboard-calendar/05-RESEARCH.md` — Tech stack decisions, library choices
3. `.planning/phases/05-dashboard-calendar/05-UI-SPEC.md` — Visual/interaction contracts
4. `.planning/phases/05-dashboard-calendar/05-*-PLAN.md` — All 5 plan files
5. `$HOME/.claude/gsd-core/workflows/plan-phase.md` — Workflow definition (steps 10-14 remain)
## Infrastructure State ## Infrastructure State
- No servers running - Docker stack running (api healthy, db healthy, web up)
- No background processes - CALENDAR_ENCRYPTION_KEY set via docker-compose.yml dev default
- Docker stack not started for this phase yet - 46 web tests passing, API tsc clean
<context>
Plan-phase orchestrator role. Was executing the plan-phase workflow from gsd-core/workflows/plan-phase.md.
Revision iteration 1 of max 3. prev_issue_count=2 (blockers). stall_reentry_count=0.
The planner agent hit its session token limit during revision but still wrote the split files to disk successfully.
Uncommitted files: 05-04-PLAN.md (modified), 05-05-PLAN.md (new), 05-PATTERNS.md (new), 05-VALIDATION.md (new).
</context>
<next_action> <next_action>
Start with: Spawn gsd-plan-checker agent on all 5 plans (.planning/phases/05-dashboard-calendar/05-0[1-5]-PLAN.md). If verification passes, proceed through steps 13→14 to finalize planning. If issues found, iterate (revision count 2/3). Run `/gsd-plan-phase 06` to plan Phase 6: Desktop Client & CI/CD (Tauri wrapper + Gitea integration).
Alternatively: run `/gsd-plan-phase 05` which will detect existing plans and offer to continue.
</next_action> </next_action>