544 Commits

Author SHA1 Message Date
schalli fc4c006f30 chore(07): UAT Test 7 pass — Exchange NTLM connection verified
Tessera CI/CD / Lint & Type Check (push) Successful in 40s
Tessera CI/CD / Tests (push) Failing after 11m1s
Tessera CI/CD / Build & Deploy (push) Has been skipped
Domain field must be left empty or set to actual AD domain; placeholder
value 'CONTOSO' causes 401.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-29 10:16:21 +02:00
schalli 01ff137f43 fix(07): UAT fixes — SMTP test email, DKV routing, Exchange domain field
Tessera CI/CD / Lint & Type Check (push) Waiting to run
Tessera CI/CD / Tests (push) Blocked by required conditions
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
- SMTP: add test-to field, send real email via sendMail() instead of verify()
- SMTP: fix no_auth warning shown as error for open-relay servers
- DKV: register dkv-fleet in MODULE_REGISTRY (fixes "Modul nicht gefunden")
- DKV: add dynamic [category]/[moduleSlug]/settings + vehicles sub-routes
- DKV: settings/vehicles links use useParams for consistent URLs
- DKV: add gear icon settings link to module main page
- DKV: rename module to "DKV-Rechnung" in seed + translations
- DKV: add optional domain field for Exchange (WebCredentials 3rd arg)
- DKV: hide IMAP-only fields (Port/Verschlüsselung/Ordner) when Exchange selected
- DKV: hide Exchange-only field (Domain) when IMAP selected
- Prisma: add domain column to DkvModuleConfig

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-28 21:58:26 +02:00
schalli 5d6024569a test(07): begin UAT — 1 issue (cold start DB P1001), 8 tests pending
Tessera CI/CD / Lint & Type Check (push) Waiting to run
Tessera CI/CD / Tests (push) Blocked by required conditions
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
2026-06-27 18:02:15 +02:00
schalli 071531f880 docs(07): add code review fix report
Tessera CI/CD / Lint & Type Check (push) Waiting to run
Tessera CI/CD / Tests (push) Blocked by required conditions
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
2026-06-27 17:23:37 +02:00
schalli d93819fa27 docs(07): add code review report
Tessera CI/CD / Lint & Type Check (push) Failing after 35s
Tessera CI/CD / Tests (push) Has been skipped
Tessera CI/CD / Build & Deploy (push) Has been skipped
2026-06-27 17:14:44 +02:00
schalli d3e8e6400a docs(07-06): complete SMTP settings UI plan
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 38s
Tessera CI/CD / Tests (push) Waiting to run
2026-06-27 17:06:04 +02:00
schalli 5c191c8d10 docs(07-05): complete DKV fleet module frontend plan
Tessera CI/CD / Lint & Type Check (push) Failing after 41s
Tessera CI/CD / Tests (push) Has been skipped
Tessera CI/CD / Build & Deploy (push) Has been skipped
2026-06-27 00:43:55 +02:00
schalli 316f8353b7 docs(07-04): complete DKV integration plane plan
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 38s
Tessera CI/CD / Tests (push) Waiting to run
SUMMARY: DkvService pipeline, DkvSchedulerService dynamic cron, DkvController 12 routes,
DkvModule registry seed, AppModule DkvModule registration, dkvFleet + settings i18n keys.
Deviation: CronJob via require() workaround (pnpm transitive dep isolation).
2026-06-27 00:32:19 +02:00
schalli 4ed1889c8d docs(07-03): complete DKV export + SMTP settings plan
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 39s
Tessera CI/CD / Tests (push) Waiting to run
- 07-03-SUMMARY.md: all 4 tasks documented, threat mitigations verified,
  user-files/ path resolution and MailModule factory priority chain explained
- STATE.md: advanced to Plan 4 of 6, added 5 new decisions, metrics row
- ROADMAP.md: 07-03 checked complete, Phase 7 progress 3/6
2026-06-27 00:16:05 +02:00
schalli c7b0103a10 docs(07-02): complete DKV inbox-access layer plan
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 43s
Tessera CI/CD / Tests (push) Waiting to run
- 07-02-SUMMARY.md: interface + IMAP + Exchange providers, all 3 DTOs, self-check passed
- STATE.md: advance to Plan 3/6, record 3 decisions, update session to 2026-06-27
- ROADMAP.md: mark 07-01 and 07-02 complete, Phase 7 progress 2/6
2026-06-27 00:06:24 +02:00
schalli 6bf032ef94 docs(07-01): complete DKV backend foundation plan
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 39s
Tessera CI/CD / Tests (push) Waiting to run
- 07-01-SUMMARY.md: execution record with PDF parser analysis, regex deviation, DB push method
- STATE.md: plan counter advanced to 2/6, decisions added, session updated
2026-06-26 19:39:18 +02:00
schalli de06794e67 docs(07): create phase 7 execution plans for DKV fleet module
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 38s
Tessera CI/CD / Tests (push) Waiting to run
6 plans covering full pipeline: PDF parsing foundation (Wave 0),
inbox providers + export/SMTP services (Wave 1), pipeline
orchestration + frontend pages + settings UI (Wave 2). Includes
D-06 MailModule DB-config migration and Nyquist validation strategy.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-26 18:56:59 +02:00
schalli e9f4f2dcad docs(07): UI design contract and validation strategy for DKV fleet module
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 40s
Tessera CI/CD / Tests (push) Waiting to run
2026-06-26 14:55:41 +02:00
schalli baf502d967 docs(07): fix blocking typography and spacing issues in UI-SPEC
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 40s
Tessera CI/CD / Tests (push) Waiting to run
Collapse Display h1 weight from 700 to 600 (font-semibold) to keep
declared weights at exactly two (400 + 600). Remove 12px md token from
named spacing scale; move px-3/py-1.5 to Component Exceptions subsection.
Apply non-blocking recommendations: focal point sentence, aria-labels for
icon-only AKTIONEN buttons, and more specific form CTA copy.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-26 14:53:49 +02:00
schalli 0c33fd6a34 docs(07): UI design contract for DKV Fleet Module
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 43s
Tessera CI/CD / Tests (push) Waiting to run
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-26 14:49:10 +02:00
schalli 741feb5946 docs(07): research phase DKV fleet module
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 39s
Tessera CI/CD / Tests (push) Waiting to run
2026-06-26 14:37:51 +02:00
schalli 4ee23bd9a4 docs(state): record phase 7 context session
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 39s
Tessera CI/CD / Tests (push) Waiting to run
2026-06-26 14:22:38 +02:00
schalli 34f06c9aa6 docs(07): capture phase context for DKV Fleet Module
Tessera CI/CD / Build & Deploy (push) Blocked by required conditions
Tessera CI/CD / Lint & Type Check (push) Successful in 43s
Tessera CI/CD / Tests (push) Waiting to run
2026-06-26 14:22:34 +02:00
schalli c69c7b2900 wip: pause — UI-Umbau fertig, DKV-Modul-Planung ausstehend
Tessera CI/CD / Lint & Type Check (push) Successful in 44s
Tessera CI/CD / Tests (push) Failing after 12m53s
Tessera CI/CD / Build & Deploy (push) Has been skipped
2026-06-26 12:16:05 +02:00
schalli 02652362f3 docs: pause work — v1.0 complete, next session: new modules
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 15:58:38 +02:00
schalli 95423497ad docs(06): complete Phase 06 — desktop wrapper + CI/CD pipeline verified
Tessera CI/CD / Lint & Type Check (push) Successful in 46s
Tessera CI/CD / Tests (push) Successful in 45s
Tessera CI/CD / Build & Deploy (push) Successful in 39s
- 06-01: Tauri scaffold complete
- 06-02: Native features (tray, window-state, autostart, version check, AppImage)
- 06-03: Gitea CI/CD pipeline green (Run #89 — all 3 jobs pass)
- Clean up handoff and continue-here files
- Update STATE.md to 100% (all 6 phases complete)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 14:09:17 +02:00
schalli c65ada0ba9 feat(06-02): add native desktop features — tray, window-state, autostart, version check
- Add GET /health/version public endpoint to API
- Extend Tauri with 4 plugins: notification, autostart, window-state, store
- Implement close-to-tray with prevent_close + prevent_exit (Pitfall 2)
- Tray menu with Oeffnen/Beenden (German labels)
- Async startup version check against server /health/version
- Generate Tessera-branded icons (yellow T on dark bg, OKLCH palette)
- Update capabilities for notification, autostart, window-state permissions

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 14:01:12 +02:00
schalli e81dbb0e69 docs(06): pause work — 06-01 complete, 06-03 pending CI verification
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 12:37:49 +02:00
schalli 2e4d499730 docs(06-03): complete CI/CD pipeline plan
Tessera CI/CD / Lint & Type Check (push) Failing after 1m10s
Tessera CI/CD / Tests (push) Has been skipped
Tessera CI/CD / Build & Deploy (push) Has been skipped
2026-06-25 11:01:55 +02:00
schalli f41e673dd5 docs(06-01): complete desktop Tauri scaffold plan 2026-06-25 10:17:22 +02:00
schalli 943cc32da7 docs(06): create phase plan 2026-06-25 09:27:16 +02:00
schalli 44154a4697 docs(06-desktop-client-ci-cd): create phase plan
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-25 09:25:24 +02:00
schalli 3d8c0660f7 docs(06): research phase domain - Tauri 2.x desktop wrapper + Gitea Actions CI/CD 2026-06-25 09:15:43 +02:00
schalli d6faa680b1 docs(state): record phase 6 context session 2026-06-25 08:35:35 +02:00
schalli a1ba4ef3de docs(06): capture phase context 2026-06-25 08:35:28 +02:00
schalli ed410eb268 wip: phase 05 complete, pause work 2026-06-24 22:41:29 +02:00
schalli 8a55806a35 docs(05-05): visual verification approved 2026-06-24 22:39:59 +02:00
schalli 6965e52bf7 docs(05-04): complete calendar frontend plan 2026-06-24 15:28:24 +02:00
schalli 694bcff4a4 docs(05-03): complete calendar backend plan
- Create 05-03-SUMMARY.md with full execution documentation
- Update STATE.md: advance to plan 4/5, add decisions, record metrics
- Update ROADMAP.md: mark 05-03 complete, 3/5 plans done
- Update REQUIREMENTS.md: CAL-01/02/03 + DASH-05 backend complete
2026-06-24 15:19:27 +02:00
schalli 7616365cbe docs(05-02): complete search + notes widgets + settings plan 2026-06-24 15:03:55 +02:00
schalli afc555b18d docs(05-01): complete dashboard grid + clock widget plan 2026-06-24 11:27:59 +02:00
schalli f925fd3654 docs(05): complete phase plan (5 plans, 5 waves, 10/10 coverage) 2026-06-24 10:13:22 +02:00
schalli 114edcf89b docs(05): complete phase plan (5 plans, 4 waves, 32/32 coverage)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-24 10:08:01 +02:00
schalli 6e99ccc2a1 fix(05): clean must_haves, trailing XML, update ROADMAP to 5 plans
- Remove frontend artifacts from 05-03 must_haves (belong to 05-04)
- Remove trailing XML generation artifacts from 05-04 and 05-05
- Update ROADMAP Phase 5: 5 plans across 4 waves

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-24 10:07:35 +02:00
schalli 271e71f901 fix(05): remove duplicate frontend tasks from 05-03, add requirements field
05-03 now backend-only (4 tasks/13 files): model+crypto+CRUD, providers,
aggregation, prisma push. Frontend tasks moved exclusively to 05-04.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-24 10:03:37 +02:00
schalli e60d34dc28 wip: phase 05 plan-phase paused at revision verify (checker v2 pending)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-24 09:54:43 +02:00
schalli c8852d2014 docs(05): create dashboard & calendar phase plan
4 plans across 4 waves covering DASH-01..07 + CAL-01..03.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 14:42:11 +02:00
schalli b5ab2c806e docs(05): research phase domain - dashboard calendar 2026-06-23 14:29:14 +02:00
schalli 2005448c51 fix(05): resolve UI-SPEC typography and copywriting checker issues
Reduce typography to 4 sizes (12/14/18/28) and 2 weights (400/600).
Clock scaling declared as responsive exception, not standalone size.
Destructive CTAs now include noun (Quelle loeschen / Delete source).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 14:12:40 +02:00
schalli cd9f74531a docs(05): UI design contract for dashboard-calendar phase
Defines visual and interaction contracts for Phase 05 including
dashboard grid, 4 widget types, settings page, and calendar integration.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 14:09:56 +02:00
schalli 0331d54e9a docs(state): record phase 05 context session 2026-06-23 14:01:18 +02:00
schalli b1101712df docs(05): capture phase context 2026-06-23 14:01:12 +02:00
schalli 7c35c17a07 docs(04-04): complete Phase 04 verification, close phase
Human verified marketplace features on localhost. 26 tests green.
Reverse proxy API URL config deferred. Phase 04 done, ready for Phase 05.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 12:26:33 +02:00
schalli a39322e7a6 wip: phase 04-04 paused at human verification (task 2/2)
Plans 04-01 through 04-03 complete. 26 tests green, stack running.
Awaiting human sign-off on 12-step verification checklist.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 11:04:28 +02:00
schalli 191135bae8 docs(04-03): complete plan summary, update STATE
Plan 04-03 done — sidebar migrated, 5 new tests (26 total).
Ready for Plan 04-04 (navigation polish).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-23 10:22:04 +02:00